Largest housing developments in Havering - Greater London
Housing schemes of 100+ homes in Havering - Greater London: waiting for a decision, approved in the last three years, and early-stage proposals. Each scheme is counted once, under its main application.
7 schemes in play, 4,570 homes in total, plus 4 early-stage proposals.
Schemes in play, largest first
Shaded areas are the site boundaries councils publish; elsewhere a dot marks the site, sized by homes.
1,298 homes
Dagenham, RM8 1JX
Demolition of existing buildings and structures, reprofiling of land and redevelopment of the site to provide 1,298 residential dwellings flats (Class C3), community/retail unit (Classes E, E(a), and F2), residential management suite, new highway junction to Crow Lane and alterations to existing highway junction to Wood Lane, artificial multi-use games area (MUGA), padel courts, enhancement works
Up to 1,070 homes
Land at Bridge Close Romford Havering RM7 0AU
Hybrid planning application for 1) Full Planning Permission for the erection of three buildings comprising 383 residential units (Class C3); 1,911 sqm (GEA) of commercial floorspace (Class E use) and a 4,202 sqm (GEA) three form entry primary school and nursery (Class F1(a)); with the erection of a new pedestrian/cycle bridge; new vehicular and pedestrian arrangements; a new public square and civi
Up to 900 homes
11 Western Road, Romford, RM1 3RL
Hybrid planning application (part full/part outline) for the part demolition of existing buildings and phased redevelopment to provide up to 900 residential units (Use Class C3); flexible commercial/community/town centre uses (Classes E/F/sui generis); back of house space; cycle and blue badge car parking; publicly accessible open space; landscaping and servicing, associated infrastructure, highwa
Up to 475 homes
east of Wingletye Lane, Hornchurch
Outline consent for a residential-led development, with all matters reserved except for access, for up to 475 dwellings, together with associated access, open space and landscaping.
Up to 411 homes
Rainham
Outline application for the erection of up to 411 dwellings with public open space, landscaping, sustainable drainage system (SuDS), and the construction of a roundabout at the intersection of Upminster Road North and Berwick Pond Road, with all matters reserved save for access.
275 homes
Hornchurch, RM12 4EU
Hybrid planning application for phased mixed-use development for the provision of houses and residential blocks of 2 to 4 storeys to include approximately 275 residential units comprising: Full planning application for restoration of the existing stake park, construction of a flexible community building and/or commercial building (Use Class F and/or E), access road, pedestrian pathways, car and
141 homes
Como Street, Romford, RM7 7DN
Construction of a residential led mixed-use scheme for the provision of three blocks (Blocks C, D and E) and three terraced houses (Block A) of 3 to 9 storeys comprising 138 residential dwelling units (Use Class C3) and flexible commercial / community floorspace together with public realm enhancements including hard and soft landscaping and associated access, servicing, vehicle and cycle parking a
Early stage: no application yet
Developers often ask the council whether a large scheme needs an environmental assessment before they apply. These requests show what's coming. They are not applications, and they don't count towards the totals above.
Up to 140 homes
Land at Upper Bedfords Romford
Screening Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended), in respect of a proposal to provide up to 140 dwellings
Up to 1,000 homes
Romford
Request for an Environmental Impact Assessment (EIA) Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in relation to a hybrid (part outline and part detailed) planning permission for the redevelopment of the site of up to 1,000 residential units, with 10,350m2 (GIA) of additional commercial space, with public realm improvements and associated
Up to 600 homes
Homebase Davidson Way Romford
Request for a screening opinion is made under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the demolition of existing building and structures on site, and the erection of up to 600 residential units and up to 400 sqm of class E floorspace (GIA), spread across 3 perimeter blocks ranging from ground and 16 storeys
Up to 570 homes
Hornchurch, RM11 3PT
Request for Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 in relation to an outline planning application for a residential-led development of up to 570 dwellings.
By county
- Aberdeenshire (7)
- Barnet - Greater London (14)
- Bedfordshire (16)
- Belfast (5)
- Berkshire (12)
- Bristol (7)
- Buckinghamshire (23)
- Cambridgeshire (24)
- Cheshire (30)
- Coleraine (5)
- Cornwall (10)
- County Durham (23)
- Croydon - Greater London (24)
- Derbyshire (23)
- Devon (21)
- Dorset (9)
- East Riding of Yorkshire (9)
- East Sussex (17)
- Essex (76)
- Gloucestershire (36)
- Greater Manchester (49)
- Hammersmith & Fulham - Greater London (6)
- Hampshire (36)
- Havering - Greater London (7)
- Herefordshire (7)
- Hertfordshire (51)
- Highland (5)
- Hounslow - Greater London (8)
- Kent (44)
- Lancashire (23)
- Leicestershire (34)
- Lincolnshire (27)
- Merseyside (20)
- Norfolk (22)
- Northamptonshire (5)
- Nottinghamshire (21)
- Oxfordshire (26)
- Shropshire (10)
- Somerset (6)
- South Lanarkshire (8)
- South Yorkshire (28)
- Staffordshire (28)
- Suffolk (17)
- Surrey (23)
- Tyne and Wear (17)
- Wandsworth - Greater London (11)
- Warwickshire (25)
- West Midlands (19)
- West Sussex (20)
- West Yorkshire (23)
- Wiltshire (18)
- Worcestershire (21)
How we count
We read the number of homes from each application's description and count each scheme once: under its outline or full application, not again for each later phase, amendment or condition. A scheme that crosses a council boundary is counted once and listed under both councils. "Up to" figures are the most the permission would allow.
"In play" means waiting for a decision (for up to five years), approved in the last three years, or still receiving applications for its phases.
Solar farms, reservoirs, roads and other projects decided nationally are on the national infrastructure projects page.