Skip to content

Largest housing developments in Berkshire

Housing schemes of 100+ homes in Berkshire: waiting for a decision, approved in the last three years, and early-stage proposals. Each scheme is counted once, under its main application.

12 schemes in play, 7,161 homes in total, plus 4 early-stage proposals.

Schemes in play, largest first

Shaded areas are the site boundaries councils publish; elsewhere a dot marks the site, sized by homes.

Awaiting decisionWokingham · 252498

Up to 2,800 homes

Hall Farm Church Lane Arborfield Reading RG2 9HX

Hybrid planning application (part in full, part in outline) comprising outline application for: up to 2,800 residential units to include up to 100 custom and self-build plots; 2 primary schools (up to 3 forms of entry) to include early years provision and 1 secondary school (up to 12 forms of entry); one District Centre, to incorporate up to 11,000m2 of Class E (Commercial, Business and Service, t

ApprovedWindsor · 24/00091/OUT

Up to 1,500 homes

Maidenhead Golf Club Shoppenhangers Road Maidenhead SL6 2PZ

Outline application, with all matters reserved except accesses (Shoppenhangers Road Access, Harvest Hill Road principal access and Harvest Hill Road secondary access), for a residential led mixed use development comprising: Up to 1,500 homes; a range of community uses including primary and secondary schools, a local centre and small-scale cafe/retail.commerical uses; public open space including la

Awaiting decisionBracknell · PA/2026/0511

Up to 850 homes

Land west of Old Wokingham Road and North and South of Easthampstead Road, Wokingham, (Proposed SDL Extension)

Hybrid application comprising an outline application with all matters reserved except means of access for a mixed use, residential-led development (up to 850 dwellings)including a neighbourhood centre (Use Classes E), a one-form entry primary school (if required) (Use Class F), public open space, play areas, allotments, drainage and other infrastructure, landscaping and demolition of existing buil

Awaiting decisionBuckinghamshire and Slough · PL/26/04941/OA

Up to 610 homes

Land North Of Langley Park Road Shreding Green Iver Buckinghamshire

Outline planning application for removal of existing structures and erection of phased mixed-use development comprising up to 610 residential dwellings (including affordable housing and self/custom-build housing), Class C2 care home up to 3,230 sqm and 75 beds, Class E(e) medical centre up to 1,400 sqm, flexible Class E/F2 uses up to 350 sqm, network of new roads, cycle and car parking, landscapin

Decision madeReading · PL/25/1651

Up to 430 homes

Land North of Mole Road and Church Lane, Newlands Farm, RG2 9JD

Outline planning application with all matters reserved other than principal access from Mole Road, for up to 430 dwellings, associated infrastructure to include a connection through to the proposed Spine Road, ref. 252498, new pedestrian cycle link connecting Byway ARB03 Carter’s Hill Lane and Byway ARB08 Ellis’s Hill, associated landscaping to include formal and informal public open space, biodiv

Awaiting decisionBracknell · PA/2026/0567

Up to 180 homes

Land north east of Easthampstead Road, Wokingham

Outline application with all matters reserved except means of access for up to 180 dwellings and associated infrastructure including open space, play space, landscaping, SuDs and green infrastructure. Please note: The application has been submitted in relation to the area proposed as an extension to the South Wokingham SDL in the Local Plan Update (LPU).

Awaiting decisionBracknell · PA/2026/0831

Up to 160 homes

MURRELL HILL GRANGE, MURRELL HILL LANE, BINFIELD, BRACKNELL, RG42 4BY

Outline application for the demolition of the single dwellinghouse and ancillary buildings at Murrell Hill Grange; the erection of up to 160 homes (including affordable homes); provision of Suitable Alternative Natural Greenspace; the creation of a new vehicular access onto Murrell Hill Lane; and the provision of a pedestrian access, open space, landscaping, SuDS, and other associated infrastructu

ApprovedBracknell · 22/00150/OUT

Up to 150 homes

Land At Priory Fields Newell Green Warfield Bracknell Berkshire

Outline application for a phased development of up to 150 dwellings (Use Class C3), a neighbourhood centre (Use Class E at ground floor), landscaping, surface water drainage, and associated infrastructure and engineering works, with all matters reserved except for means of access with Newell Green.

Awaiting decisionBracknell · PA/2026/0885

136 homes

PINEWOOD HOUSE, NINE MILE RIDE, WOKINGHAM, RG40 3EA

Full application for the proposed erection of 136 dwellings (Use Class C3) along with associated parking, landscaping, public open space, drainage infrastructure, access and highway improvements, Suitable Alternative Natural Greenspace (SANG) and ancillary works following demolition of existing office campus.

Awaiting decisionWokingham and Bracknell · 260720

136 homes

Pinewood Campus Nine Mile Ride Wokingham RG40 3EW

Full application for the proposed erection of 136 dwellings (Use Class C3) along with associated parking, landscaping, public open space, drainage infrastructure, access and highway improvements, Suitable Alternative Natural Greenspace (SANG) and ancillary works following demolition of existing office campus.

Awaiting decisionWokingham · 262497

Up to 108 homes

The Pavillions Ruscombe Park Ruscombe Wokingham

Prior approval submission for the proposed change of use of existing office accommodation (Use Class E(g)(i)) within Units 1–5 and 7–9 to 108 residential apartments (Use Class C3) under Schedule 2, Part 3, Class MA of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). (APPLICATION IS NOT FULLY VALID YET)

Awaiting decisionWindsor · 25/01050/FULL

101 homes

Land Bounded By Ascot Fire Station Station Hill And West of Hermitage Parade And South of High Street Ascot

Redevelopment of existing site to provide 1,775m2 of commercial and community floorspace (mix of uses within Use Classes E, F1 and F2) and 101 dwellings with associated parking, access, open space, landscaping and other associated works. Provision of new public open space with associated hard and soft landscape works, new pedestrian and cycle paths and children's play area.

Early stage: no application yet

Developers often ask the council whether a large scheme needs an environmental assessment before they apply. These requests show what's coming. They are not applications, and they don't count towards the totals above.

Early stage: no application yetWindsor · 26/01124/EIASCR

180 homes

Land Between Ascot Road And Holyport Road Holyport Maidenhead

Screening Opinion from the Council under Regulation 6 of the Environmental Impact Assessment Regulations 2017 ("the EIA Regulations"), to confirm whether or not there is a requirement for an Environmental Impact Assessment ("EIA") in relation to the demolition of existing structures (Lodge Farm former stable building, concrete framed open barn, pigsty and agricultural hardstanding) to deliver 180

Early stage: no application yetBuckinghamshire and Slough · PL/26/01594/EIASO

Up to 750 homes

Land North Of Langley Park Road Iver Buckinghamshire

Request for an EIA Scoping Opinion under Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for up to 750 residential dwellings, a new local centre comprising a new care home, a new medical centre and other non-residential uses, ancillary structures for utilities and services, provision of green infrastructure, provision of blue infrastruc

Early stage: no application yetWokingham · 241326

191 homes

Land North of Arborfield Road Shinfield Wokingham

Screening Opinion application for an Environmental Impact Assessment for the proposed 191 residential dwellings with landscaping and associated infrastructure. The buildings predominantly two storey houses. Some three storey buildings (apartment blocks) would be provided and the height not exceed 13m above finished floor level. Including associated access from Aborfield Road to South side and via

Early stage: no application yetWokingham · 241261

Up to 475 homes

LAND OFF BASINGSTOKE ROAD SPENCERS WOOD

Screening opinion for the erection of up to 475 dwellings (Use Class C3), 1ha of employment land, primary school, local centre, sports pitch, public open space, and associated infrastructure.

By county

How we count

We read the number of homes from each application's description and count each scheme once: under its outline or full application, not again for each later phase, amendment or condition. A scheme that crosses a council boundary is counted once and listed under both councils. "Up to" figures are the most the permission would allow.

"In play" means waiting for a decision (for up to five years), approved in the last three years, or still receiving applications for its phases.

Solar farms, reservoirs, roads and other projects decided nationally are on the national infrastructure projects page.