Largest housing developments in Bristol

Housing schemes of 100+ homes in Bristol: waiting for a decision, approved in the last three years, and early-stage proposals. Each scheme is counted once, under its main application.

7 schemes in play, 1,892 homes in total, plus 2 early-stage proposals.

Schemes in play, largest first

Shaded areas are the site boundaries councils publish; elsewhere a dot marks the site, sized by homes.

Awaiting decisionBristol · 24/03186/P

Up to 555 homes

Land South Of The A4 Bath Road, Adjoining Brislington Park And Ride Bath Road Brislington Bristol BS4 5RU

Application for Outline planning permission with some matters reserved for up to 555 residential dwellings, a local centre including up to 1,000 m2 gross floor area comprising Use Classes E and F2, green infrastructure including sustainable drainage, ecological habitats, network of footpaths and cycle paths, childrens play areas and amenity green space, site access works and associated infrastruct

ApprovedBristol · 21/00531/P

350 homes

Hengrove Leisure Park Hengrove Way Bristol BS14 0HR

Outline planning application for demolition and residential-led redevelopment comprising up 350no. Use Class C3 dwellings (including affordable dwellings), and up to 1,650sqm of flexible Class E uses, of which 150sqm is also Sui Generis (Hot Food Takeaway), along with cycle accesses, parking, servicing, landscaping, public realm, and associated works. Approval sought for Access, with all other mat

ApprovedBristol · 22/01878/P

Up to 260 homes

Land At Broom Hill/Brislington Meadows Broomhill Road Bristol BS4 4UD

Application for Outline Planning Permission with some matters reserved - Development of up to 260 new residential dwellings (Class C3 use) together with pedestrian, cycle and vehicular access, cycle and car parking, public open space and associated infrastructure. Approval sought for access with all other matters reserved. (Major)

Awaiting decisionBristol · 23/03104/P

Up to 252 homes

Graphic Packaging Filwood Road Bristol BS16 3SB

Outline application for demolition and re-development of the existing factory buildings comprising up to 252 no. Use Class C3 dwellings (including affordable housing) and 190 sqm of Use Class E floorspace, along with cycle accesses, parking, servicing, landscaping, public realm, and associated works. Access to be determined with all other matters reserved for future consideration. (Major)

Awaiting decisionBristol · 26/10739/COND

209 homes

Hengrove Park (Phase 1) Hengrove Way Bristol

Application for approval of detail reserved by condition 9 of permisison 23/02376/M Application for approval of Reserved Matters (appearance, layout, landscaping and scale) following outline approval 19/02632/PB. Approval sought for Phase 1 of the Hengrove Park project involving 209 residential units

ApprovedBristol · 21/01699/P

Up to 160 homes

Department For Work And Pensions Flowers Hill Bristol BS4 5LA

Application for Outline Planning Permission With Some Matters Reserved. Demolition of existing buildings/structures (with the exception of the Grade II Listed War Room) and redevelopment to provide up to 160 residential units (Class C3); change of use of the War Room to provide 489 sq.m of floorspace within Class B8 (storage or distribution), Class E (Commercial, Business and Service) and/or Class

ApprovedBristol · 23/03791/F

106 homes

Amerind Grove Nursing Home 124 - 132 Raleigh Road Bristol BS3 1QN

Demolition of existing buildings, site preparation works, and the development of 106no. new residential dwellings (C3) including the creation of new access arrangements and provision of supporting infrastructure. (Major)

Early stage: no application yet

Developers often ask the council whether a large scheme needs an environmental assessment before they apply. These requests show what's coming. They are not applications, and they don't count towards the totals above.

By county

How we count

We read the number of homes from each application's description and count each scheme once: under its outline or full application, not again for each later phase, amendment or condition. A scheme that crosses a council boundary is counted once and listed under both councils. "Up to" figures are the most the permission would allow.

"In play" means waiting for a decision (for up to five years), approved in the last three years, or still receiving applications for its phases.

Solar farms, reservoirs, roads and other projects decided nationally are on the national infrastructure projects page.