Largest housing developments in Herefordshire
Housing schemes of 100+ homes in Herefordshire: waiting for a decision, approved in the last three years, and early-stage proposals. Each scheme is counted once, under its main application.
7 schemes in play, 3,051 homes in total, plus 5 early-stage proposals.
Schemes in play, largest first
Shaded areas are the site boundaries councils publish; elsewhere a dot marks the site, sized by homes.
1,000 homes
Eastern Parcel, Land South West of Leominster Herefordshire
Outline planning permission for residential-led development, including: access from Hereford road; link road provision; housing (circa 1,000 dwellings) (Class C2/C3); community hub (Classes E, F.2 and C3); formal and informal open space including sports uses; landscaping; pedestrian and cycle routes; and all other associated works including highways, drainage and infrastruct
650 homes
Western Parcel, Land South West of Leominster Herefordshire
Hybrid Application (REFER TO APPLICATION FORM FOR FULL DESCRIPTION OF DEVELOPMENT, IN SUMMARY): Full Planning Permission for Food store (Class E) access and works. Outline Application with all matters reserved except access, comprising circa 650 C2/C3 dwellings; access from unnamed road adj Morrisons food store; site link road; local centre (commercial/ (Class E) and/or community use
Up to 540 homes
Land to the south of Lower Bullingham west of the Rotherwas Industrial Estate north of the Rotherwas Hereford HR2 6JW
PENDING S106 AGREEMENT - The first phase of an urban extension (known as the Southern Urban Expansion in the Herefordshire Local Plan Core Strategy) comprising up to 540 homes (Use Class C3); employment land (Use Class B and E), local centre and a country park together with supporting public open space, and all other associated works (e.g. demolition of existing industrial buildings, drain
Up to 350 homes
Land at Three Elms, North East Quarter To the north east of Huntington and bounded by Three Elms Road and Roman Road Hereford Herefordshire HR4 7RA
PENDING S106 AGREEMENT - Outline Planning application with all mattersreserved, except access, for the first phase of an urban extension comprising up to 350 homes (Use Class C3); and a care home (Use Class C2), park & choose interchange; together with open and play space, landscaping, infrastructure and associated works.
Up to 250 homes
Land to the north of Granary Cottage Credenhill Hereford HR4 7DA
Outline application with all matters reserved, save access, for a development of up to 250 residential dwellings (Use Class C3).
Up to 156 homes
Land at Marsh Farm Ross on Wye Hereford Herefordshire HR9 7NL
Outline planning application, with all matters reserved except for strategic access, for the erection of up to 156 dwellings (Use Class C3), the provision of public open space, landscaping, green corridors,sustainable urban drainage systems and engineering works including foul water pumping station and electrical substation, the demolition of 8 and 9 The Glebe, and works to no 10 The Glebe
105 homes
Land to the north of Hedgerow Way Holmer Hereford Herefordshire HR4 9RG
Proposed erection of 105 dwellings alongside access, and associated infrastructure including the widening of the northern footpath to 3 metres along Hedgerow Way (DOC 5 & 8 see 240438)(For DOC 7 & 9 see 240760) (DOC 3 see 241049) (For DOC 10 see 241634) (For DOC 4 see 241635)
Early stage: no application yet
Developers often ask the council whether a large scheme needs an environmental assessment before they apply. These requests show what's coming. They are not applications, and they don't count towards the totals above.
Up to 250 homes
Land North of the A4103 Withington Hereford
Request for screening opinion for the development of up to 250 dwellings, open space, and all other associated works including new vehicular access from the A4103
400 homes
Land at Holmer North Hereford Herefordshire
Request for Screening opinion for the development of 400 dwellings, including the provision of a Park and Choose facility, local centre and other associated infrastructure.
Up to 600 homes
Land south east of Ledbury Ledbury Herefordshire
Request for Scoping Opinion for the proposed development for the construction of a residential-led mixed use development of up to 600 dwellings, a local retail facilities and associated access, public open space, SuDs features, infrastructure and landscaping works.
Up to 450 homes
Land South of Ledbury Ledbury Herefordshire
Request for screening opinion for the proposed development comprising the construction of a residential-led mixed use development of up to 450 dwellings, with community and local retail facilities and associated access, public open space, SuDs features, infrastructure and landscaping works. Outline planning permission will be sought withall matters reserved except access.
Up to 1,600 homes
Land South of Leominster Leominster Herefordshire
Request for scoping opinion for one hybrid application in respect of Site A and one outline application in respect of Site B, which together will encompass up to 1,600 dwellings, (c. 650 residential dwellings on Site A and c. 950 dwellings on Site B), in addition to a local centre, 2 form-entry primary school, community hub and associated open space and green infrastructure, ac
By county
- Aberdeenshire (7)
- Barnet - Greater London (14)
- Bedfordshire (16)
- Belfast (5)
- Berkshire (12)
- Bristol (7)
- Buckinghamshire (23)
- Cambridgeshire (24)
- Cheshire (30)
- Coleraine (5)
- Cornwall (10)
- County Durham (23)
- Croydon - Greater London (24)
- Derbyshire (23)
- Devon (21)
- Dorset (9)
- East Riding of Yorkshire (9)
- East Sussex (17)
- Essex (76)
- Gloucestershire (36)
- Greater Manchester (49)
- Hammersmith & Fulham - Greater London (6)
- Hampshire (36)
- Havering - Greater London (7)
- Herefordshire (7)
- Hertfordshire (51)
- Highland (5)
- Hounslow - Greater London (8)
- Kent (44)
- Lancashire (23)
- Leicestershire (34)
- Lincolnshire (27)
- Merseyside (20)
- Norfolk (22)
- Northamptonshire (5)
- Nottinghamshire (21)
- Oxfordshire (26)
- Shropshire (10)
- Somerset (6)
- South Lanarkshire (8)
- South Yorkshire (28)
- Staffordshire (28)
- Suffolk (17)
- Surrey (23)
- Tyne and Wear (17)
- Wandsworth - Greater London (11)
- Warwickshire (25)
- West Midlands (19)
- West Sussex (20)
- West Yorkshire (23)
- Wiltshire (18)
- Worcestershire (21)
How we count
We read the number of homes from each application's description and count each scheme once: under its outline or full application, not again for each later phase, amendment or condition. A scheme that crosses a council boundary is counted once and listed under both councils. "Up to" figures are the most the permission would allow.
"In play" means waiting for a decision (for up to five years), approved in the last three years, or still receiving applications for its phases.
Solar farms, reservoirs, roads and other projects decided nationally are on the national infrastructure projects page.