Search South Bank (YO23) planning applications
32 in the last 90 days9 in the last 302 in the last 1480% approved
Applications within 1km of the centre of South Bank (YO23) · updated daily
Postcode districts in South Bank (YO23)
- Flat 1 232 Tadcaster Road York YO24 1ES
Variation of condition 2 of permitted application 26/00389/FUL to alter the elevations and materials of the single storey rear extensions
Pending420m awayReceived 14 Oct 202626/01846/FUL - 28 Hob Moor Terrace York YO24 1EY
Single storey side and rear extension following demolition of garage and store
Pending810m awayReceived 12 Oct 202626/01830/FUL - 27 St Georges Place York YO24 1DT
To laterally reduce the crown of 1no. Willow Tree back to the boundary - tree works in a Conservation Area.
Pending630m awayReceived 1 Oct 202626/01786/TCA - 21 St Georges Place York YO24 1DT
Fell 1no. White Willow Tree in a Conservation Area.
Pending630m awayReceived 1 Oct 202626/01785/TCA - 25 Scarcroft Hill York YO24 1DF
Crown reduction of 1no. Apple (T1) and1no. Cherry (T2) by up to 1m and 1no. Rowan (T3) up to 0.5m - trees works in a conservation area
Pending360m awayReceived 1 Oct 202626/01780/TCA
Planning data sourced from North Yorkshire council planning portal · Statistics based on the last 24 months
Frequently asked questions
How many planning applications have been submitted near South Bank (YO23)?
How long do planning decisions take near South Bank (YO23)?
What is the planning approval rate near South Bank (YO23)?
What types of planning applications are most common near South Bank (YO23)?
How can I track planning applications near South Bank (YO23)?
Planning activity near South Bank, North Yorkshire
Nearby towns and villages
- Nunthorpe1.0 km61 applications in the last 12 months
- York1.0 km359 applications in the last 12 months
- Acomb2.0 km53 applications in the last 12 months
- Walmgate Stray2.0 km106 applications in the last 12 months
- Heworth2.8 km207 applications in the last 12 months
- Clifton3.0 km139 applications in the last 12 months
- Bishopthorpe3.0 km44 applications in the last 12 months
- Chapel Fields3.1 km59 applications in the last 12 months
Planning authority
Planning Permission in South Bank - Find the Right Professional
Find an Architect in South Bank
Find your architect near South Bank for planning permission applications, extensions and new builds.
Find a Building Contractor in South Bank
Find local builders near South Bank for planning-approved builds and permitted development works.
Common planning application types near South Bank
About South Bank - Planning Applications & Local Development
South Bank, located on the southern banks of the River Thames in the London Borough of Lambeth, is a vibrant hub of entertainment and commerce. This area is known for its cultural attractions, including theatres, galleries, and restaurants, making it a key focus for planning applications related to urban development and tourism. The other has a population of approximately 6,548. It sits within the Redcar and Cleveland district.
There are currently no active flood warnings for the South Bank area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes South Bank a particularly low-crime area, which is often reflected in its desirability and property values.
The area around South Bank has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, South Bank planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near South Bank, visit the local authority's planning portal directly. Planning Signal links to the original council submission for every application listed above.
In the last 24 months, 266 planning applications were submitted near South Bank. Of these, 80% were approved, with an average decision time of 64 days.
The most common types were tree works (17), discharge of conditions (17), amendments (9). 1 large-scale development was submitted during this period.
2 planning appeals were lodged, of which 1 was allowed and 1 was dismissed (50% success rate).