Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

New Basford, Nottinghamshire Planning Applications

Recent planning applications near New Basford, Nottinghamshire.

Nottinghamshire · England · settlement

View council

About New Basford

New Basford is a northern suburb of Nottingham, incorporated into the city in 1877, and primarily features Victorian architecture. As part of the Basford ward, which had a population of approximately 16,779 in 2019, it is strategically located near the River Leen and offers excellent transport links to Nottingham City Centre via the Nottingham Express Transit tram service. This area presents various opportunities for planning applications, particularly in residential and commercial developments.

Enter a postcode to search for planning applications near New Basford.

Town Insights

Property Prices

Area Information

  • Admin district: Nottingham
  • Parliamentary constituency: Nottingham East
  • LSOA: Nottingham 018D

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near New Basford.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near New Basford.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for New Basford based on the last 24 months of planning data.

Nearby Applications

10 planning applications found near New Basford.

  1. - 10 Alpine Street Nottingham Nottingham City NG6 0HS
    Details submitted to discharge conditions 3 (materials) and 4 (hard and soft landscaping) of planning permission 24/00978/PFUL3.
    Status: Undecided | Type: Conditions | Council: Nottingham | Date: 2026-02-16
    View full details
  2. - 151 Wilkinson Street Nottingham Nottingham City NG8 5FL
    REPLACEMENT OF EXISTING GYM WITH GRANNY ANNEXE WITH MONO-PITCH ROOF
    Status: Withdrawn | Type: Full | Council: Nottingham | Date: 2026-01-19
    View full details
  3. - 52 Isandula Road Nottingham Nottingham City NG7 7ES
    Single storey rear extension
    Status: Conditions | Type: Full | Council: Nottingham | Date: 2026-01-12
    View full details
  4. - Northern Part Of Former British Gas Works Site Radford Road Nottingham
    Partially discharge Condition 12 for Phase 5 only, in accordance with the approved Development Phasing Plan of planning permission 21/01786/PFUL3
    Status: Permitted | Type: Conditions | Council: Nottingham | Date: 2025-12-22
    View full details
  5. - 827 Western Boulevard Nottingham Nottingham City NG8 5FG
    Single storey extension to Rear
    Status: Undecided | Type: Full | Council: Nottingham | Date: 2025-06-06
    View full details
  6. - 117A North Gate Nottingham Nottingham City NG7 7FZ
    Convert the existing residential building (Use Class C3) to an eight person House in Multiple Occupation (HMO) (Sui Generis) and retain fence
    Status: Rejected | Type: Full | Council: Nottingham | Date: 2025-05-07
    View full details
  7. - Lewis Industrial Estate, Units 1 And 2 Armstrong Way Nottingham Nottingham City NG7 7NW
    Installation of 4 no. external air source heat pump units
    Status: Conditions | Type: Full | Council: Nottingham | Date: 2024-09-04
    View full details
  8. - Unit 4 Bleachers Yard Nottingham Nottingham City NG7 7EF
    Change of use from a general industrial unit to a place of worship.
    Status: Conditions | Type: Full | Council: Nottingham | Date: 2023-12-27
    View full details
  9. - 491 Nottingham Road Nottingham Nottingham City NG6 0FB
    Change of Use from commercial to residential floor space to be in connection with an existing dwelling, and alterations to ground floor frontage
    Status: Conditions | Type: Full | Council: Nottingham | Date: 2023-07-19
    View full details
  10. - 8 Romans Court Nottingham Nottingham City NG6 0HF
    T1 - LIME - Crown lift to 4.5m from ground and crown thin by 5%, tree has become very dense, owner is concerned as overhangs a public footpath and hasn't been maintained
    Status: Conditions | Type: Trees | Council: Nottingham | Date: 2023-04-18
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of New Basford in Nottinghamshire

New Basford is a northern suburb of Nottingham, incorporated into the city in 1877, and primarily features Victorian architecture. As part of the Basford ward, which had a population of approximately 16,779 in 2019, it is strategically located near the River Leen and offers excellent transport links to Nottingham City Centre via the Nottingham Express Transit tram service. This area presents various opportunities for planning applications, particularly in residential and commercial developments.

There were no crimes reported in the immediate area during the most recent reporting period. This makes New Basford a particularly low-crime area.

New Basford has 5 conservation areas within its boundaries: Sherwood Rise, Waterloo Promenade, Forest Grove, Star Buildings, Arboretum. Planning applications within or near these conservation areas are subject to additional scrutiny to preserve the architectural and historic character of the area. Homeowners and developers should be aware that permitted development rights may be restricted.

For anyone interested in property development or monitoring local planning decisions, New Basford planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in New Basford

In the last 24 months, 36 planning applications were submitted near New Basford. Of these, 57% were approved, with an average decision time of 63 days.

This is below the national average of approximately 87%, which may reflect stricter local policies, sensitivity of the area, or higher levels of speculative applications. Pre-application advice is particularly worthwhile near New Basford.

At 63 days on average, decisions near New Basford slightly exceed the 8-week statutory target for minor applications, though this is common across many councils.

The most common application types near New Basford were full planning applications (21), discharge of conditions (4), outline applications (3). Full planning applications account for 58% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

Nearby Towns

Explore planning applications in nearby areas:

  • Old Basford planning applications
  • Carrington planning applications
  • Whitemoor planning applications
  • Nottingham planning applications
  • Radford planning applications
  • Highbury Vale planning applications
  • Lenton planning applications
  • Top Valley planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account