Skip to content
Decision madeCarbon capture· EN010103

The Net Zero Teesside Project

A nationally significant infrastructure project in Stockton-on-Tees, Redcar and Cleveland. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 463 hectares inside the published boundary.

What is proposed

A full chain carbon capture, utilisation and storage (‘CCUS’) project, comprising a CO2 gathering network, including CO2 pipeline connections from industrial facilities on Teesside to transport the captured CO2 (including the connections under the tidal River Tees); a combined cycle gas turbine (‘CCGT’) electricity generating station with an abated capacity up to circa 860 MW of low carbon electricity, cooling water, gas and electricity grid connections and CO2 capture; a CO2 gathering/booster station to receive the captured CO2 from the gathering network and CCGT generating station; and the onshore section of a CO2 transport pipeline for the onward transport of the captured CO2 to a suitable offshore geological storage site in the North Sea.

Linked planning applications

Council consultations, related applications and requirement sign-offs that quote this project.

  • R/2026/0611/CD · Redcar and Cleveland · 2 September 2026

    Re-discharge of Requirement 3(7) (Detail Design) in relation to Work No 6 of the NZT DCO of reference number EN010103 for The Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to section 114 ‘Grant or ref

  • R/2026/0435/CD · Redcar and Cleveland · 17 June 2026

    Discharge of Requirement 4(4) (Landscape and biodiversity protection management and enhancement) of reference number EN010103 of the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and NetZero pursuant to section 114 ‘Grant

  • 26/1154/DCH · Stockton-on-Tees · 11 June 2026

    Information to part discharge Requirement 4(4) Landscape and biodiversity protection management and enhancement Work Nos. 1 or 7) of planning approval 20/0846/NSIP (EN010103)

  • 26/0578/DCH · Stockton-on-Tees · 20 March 2026

    Information to part discharge condition No.3 (Detailed Design) of planning approval 20/0846/NSIP (EN010103) - Net Zero Teesside Project (Work No. 6A (above ground installations required to facilitate work no. 6)

  • 26/0021/DCH · Stockton-on-Tees · 5 January 2026

    Information to discharge condition no3 (Detailed design), no4 (landscape and biodiversity protection management and enhancement), no6 (external lighting (construction), no8 (means of enclosure), no10 (fire prevention), no11 (surface water drainage design (construction and operation)), no12 (flood ri

  • R/2025/0715/CD · Redcar and Cleveland · 27 October 2025

    Discharge of Requirement 6(2) (Operational Lighting) in respect of Work Nos 1, 3b, 5b, 7 and 8 of the NZT DCO of reference number EN010103 for the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to sect

  • R/2025/0586/CD · Redcar and Cleveland · 8 September 2025

    Discharge of Requirement 3 (2)(3) & (7) (Detail Design) in relation to Work Nos.2A & 2b & 6 of the NZT DCO of reference number EN010103 for theThe Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to sect

  • 25/1886/DCH · Stockton-on-Tees · 5 September 2025

    Information to discharge conditions no 17 (Protection of highway surfaces), no18 (Construction Traffic management Plan), no19 (Construction Workers Travel Plan) of application 20/0846/NSIP (EN010103) Work No. 2A (Underground High Pressure Gas Pipeline) in relation to work No. 2B (Above Ground Instal

  • 25/1611/DCH · Stockton-on-Tees · 1 August 2025

    Information to discharge conditions no 16 (construction environmental management plan), no4 (landscape and biodiversity protection management and enhancement) no6(1) (external lighting (construction)), no7 (highway access), no11(1) (surface and foul water drainage) no12(1) (flood risk mitigation (co

  • R/2025/0365/CD · Redcar and Cleveland · 28 May 2025

    Partial Discharge of Requirement 8(3) (Means of Enclosure (Permanent Fencing)) of reference number EN010103 for The Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant to section 114 ‘Grant or refusal of de

  • R/2025/0068/CD · Redcar and Cleveland · 29 January 2025

    Discharge of Requirement 19 (Construction workers travel plan) in respect of Work Nos. 1, 7, 3B and 9A of the NZT DCO of reference number EN010103 for the Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary of State for the Department for Energy Security and Net Zero pursuant

  • R/2024/0863/CD · Redcar and Cleveland · 24 December 2024

    Partial Discharge of Requirements 16(CEMP); 4(1)(Landscape and Biodiversity); 6(1)(External Lighting); 12(Flood Risk Mitigation); 15(Protected Species); 21(Noise) and 24(Waste Management) of reference number EN010103 for The Net Zero Teesside Order 2024 (the ‘Order’), which was made by the Secretary

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.