Lighthouse Green Fuels Project
A nationally significant infrastructure project in Stockton-on-Tees, Redcar and Cleveland. Accepted for examination; people can register to have their say.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 234 hectares inside the published boundary.
What is proposed
Second generation SAF production, pre-treatment, processing and storage plant; marine infrastructure, pipelines for export of finished product to marine or rail loading infrastructure; biomass-fired Combined Heat and Power (CHP) plant with an electrical output capacity of up to approximately 200Mwe with additional steam production for SAF production; pipelines for utilities including for the supply of raw water, potable water, natural gas, oxygen and nitrogen; wastewater treatment and discharge; an electricity connection; air separation unit (ASU) for alternative provision of oxygen and nitrogen; feedstock, intermediates and product bulk storage; and other associated and ancillary infrastructure.