Byers Gill Solar
A nationally significant infrastructure project in Stockton-on-Tees, Durham, Darlington. A decision has been made.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 490 hectares inside the published boundary.
What is proposed
The project consists of a proposed solar farm with over 50MW capacity, Solar PV modules and associated mounting structures, inverters, transformers, switch gear and control equipment, a substation, energy storage equipment and underground on and off-site cabling.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.