Skip to content
Pre-applicationPipeline· EN0710010

East Coast Hydrogen Teesside Pipeline

A nationally significant infrastructure project in Darlington, Durham, Hartlepool, Redcar and Cleveland, Stockton-on-Tees. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 2,595 hectares inside the published boundary.

What is proposed

The Project will convey hydrogen from production and storage locations proposed by third-parties in the North East Region to a range of industrial consumers across Teesside and County Durham, including potential connections to other third party operated networks. The Project consists of the construction (including repurposing) and operation of an approximately 63km underground high and intermediate pressure hydrogen pipeline between Teesside and Newton Aycliffe. It will include spurs off the main pipeline to connect with off-takers and will also include associated infrastructure (e.g. Above Ground Infrastructure such as Pressure Reduction Installations, Block Valve Stations and district governors) along the route of the pipeline.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.