Skip to content

Single-storey rear extensions in Brent

Brent approved 970 of the 1,283 planning applications for single-storey rear extensions it decided in the last five years (76%), and the typical decision took 64 days.

London Borough of Brent · planning applications received Oct 2021 to Oct 2026 · updated 25 Oct 2026

Approved

970 of 1,283

76% of decided applications; 24 withdrawn, 51 undecided

Typical time to a decision

64 days

median, from 1,280 decisions with both dates published

Decided within 8 weeks

439 of 1,280

8 weeks is the usual statutory period; councils can agree extensions

See what was approved near your own address

The The Signal Report shows approvals and refusals for single-storey rear extensions within 250 m, 500 m and 1 km of your home, the council's reasons for refusing similar schemes, your property's planning history and the constraints on the plot. Free preview for any address.

Recent decisions

  1. Proposed demolition of rear extension and erection of single-storey rear extension to dwellinghouse.

    26/2178 · decided 22 Oct 2026

  2. Proposed single storey rear extension with raised platform and installation of safety railings, h...

    26/2123 · decided 21 Oct 2026

  3. Proposed demolition of conservatory and erection of single-storey rear extension to dwellinghouse.

    26/2184 · decided 21 Oct 2026

  4. CONVERSION OF TEMPORY SHED INTO REAR EXTENSION AND GROUND FLOOR AND FIRST FLOOR EXTENSION

    26/0097 · decided 16 Oct 2026

  5. Demolition of rear extension and erection of single-storey rear extension and single-storey outbu...

    26/1428 · decided 12 Oct 2026

Why Brent refuses single-storey rear extensions

The council's own words, quoted from recent decision notices.

  1. 24, Ealing Road, Wembley, HA0 4TL

    “1 The proposed development would involve the installation of a replacement extraction flue and associated plant to serve the extended restaurant use. However, insufficient information has been submitted regarding the location, specification and acoustic performance of the proposed extraction equipment, and a Noise Impact Assessment has not been provided. As a result, the Local Planning Authority cannot be satisfied that the development would not give rise to unacceptable noise and vibration impacts to nearby residential occupiers, particularly those within adjoining residential properties. Th…”

  2. 32A Park Road, Wembley, HA0 4AT

    “1 The proposed extension, by virtue of its excessive depth and eaves height, would have an unduly detrimental impact on the outlook, light and result in an increased sense of enclosure to the habitable room windows and the rear patio enjoyed by the neighbouring occupier(s) at No 30 and 34a & 34b Park Road. This is contrary to policy DMP1 of the Brent Local Plan 2019-2041 and the guidance in Brent's Residential Extensions and Alterations SPD 2025. 2 The proposed outbuilding by virtue of its excessive footprint would represent an overdevelopment of the rear garden and result in the retention of…”

  3. 202 & 202A Carlton Avenue East, Wembley, HA9 8PT

    “1 The proposed rear extension would facilitate a revised internal layout resulting in the provision of an additional bedroom with no outlook and insufficient information to demonstrate that an acceptable level of daylight would be achieved. The proposal would therefore result in a poor and unacceptable standard of accommodation for future occupiers, contrary to Brent Residential Extensions and Alterations SPD (2025), Brent Local Plan (2019-2041) policy DMP1 and London Plan policy D6. 2 The proposed front porch, due to its combined excessive depth, finish and proposed front doors, would result…”

Other home extensions in Brent

All planning applications in Brent

How these figures are made

Planning applications London Borough of Brent received Oct 2021 to Oct 2026, from the council's public planning register as collected by Planning Signal. An application counts as a single-storey rear extension when its own description says so (rules-based classification, tested against blind labelled samples). Duplicate records of one application are counted once. The approval figure counts approved and refused planning applications only: withdrawn and undecided ones, lawful development certificates and prior approvals are left out. Decision times use the received (or validated) date and the decision date the council published.

Past decisions describe what happened to other applications. They are not a prediction for yours: every application is decided on its own design and the council's current policies.