Skip to content

Planning in Wincobank

Approved
81%
13 of 14 decided
Decision time
about 10 weeks
on average

Applications within 1 km of the centre of Wincobank in the last 24 months, from Sheffield City Council's planning register.

Decided by Sheffield City CouncilCouncil page

Around Wincobank

Postcode districts

S9 158 applications in the last 12 monthsS5 119 applications in the last 12 monthsS61 37 applications in the last 12 months

Applications in each district in the last 12 months.

Planning authority: Sheffield City Council

For home projects and trades

About Wincobank

Wincobank is a district within the Shiregreen and Brightside ward of Sheffield, South Yorkshire, which encompasses the areas of Brightside, Shiregreen, and Wincobank itself. Covering 6.5 km² in the northern part of the city, the ward had a population of 20,826 across 8,696 households as of the 2011 census. It is part of the Sheffield Brightside and Hillsborough parliamentary constituency, making it a notable area for those researching planning applications and local developments.

There are currently no active flood warnings for the Wincobank area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.

In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Wincobank a particularly low-crime area, which is often reflected in its desirability and property values.

The area around Wincobank has 5 nature designations nearby, which may affect how planning applications are assessed.

For anyone interested in property development or monitoring local planning decisions, Wincobank planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

To comment on or object to a planning application near Wincobank, open it in the list above: each one links to the council's own page for it and shows any comment deadline.

In the last 24 months, 40 planning applications were submitted near Wincobank. Of these, 81% were approved, with an average decision time of 68 days.

The most common types were discharge of conditions (9), outline applications (3), amendments (2).

1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).

Common questions

How many planning applications have been submitted near Wincobank?
In the last 24 months, 40 planning applications were submitted near Wincobank. The approval rate is 81%.
How long do planning decisions take near Wincobank?
The average planning decision time near Wincobank is 68 days. The statutory target is 8 weeks (56 days) for minor applications and 13 weeks for major applications.
What is the planning approval rate near Wincobank?
The planning approval rate near Wincobank is 81%. The national average across England and Wales is 87%.
What types of planning applications are most common near Wincobank?
The most common type of planning application near Wincobank is discharge of conditions, with 9 submissions in the last 24 months.
How can I track planning applications near Wincobank?
You can search and track planning applications near Wincobank on Planning Signal. Create a free account to save searches, watch specific applications, and receive email alerts when new plans are submitted nearby.