Search Wincobank planning applications
36 applications received or decided in the last 12 months · within 1 km of the centre of Wincobank · updated daily · Sheffield City Council
Only 6 applications in the last 90 days, so this shows the last 12 months.
- 1 Jenkin Drive Sheffield S9 1ARAwaiting decisionConversion of retail storage area to form a separate retail unit (Use Class E) including the installation of a new shopfrontReceived 30 Oct 202626/03158/FUL
- Site Of Former Outokumpu Fife Street Sheffield S9 1NJAwaiting decisionApplication to approve details in relation to condition number(s): 9 (Tree Protection) imposed by planning permission 25/00735/FULReceived 7 Oct 202625/00735/COND7
- Costcutter 20 Fife Street Sheffield S9 1NJAwaiting decisionErection of two-storey rear extension and single-storey side and rear extension, and sub division of first floor to form two self contained flats (Use Class C3)Received 1 Oct 202626/02935/FUL
- Street Record Tinsley Viaduct Sheffield S9 1USAwaiting decisionEIA (Environmental Impact Assessment) Screening Opinion Request for the Proposed Tinsley Viaduct Natural Gas Pipeline DiversionReceived 25 Sep 202626/02926/EIA
- Site Of 330 To 332 Newman Road Sheffield S9 1LXDecidedApplication to approve details in relation to condition no(s) 6 (site levels), 7 ,10 and 14 (sound attenuation works), 8 (validation test), 9 (externally mounted plant/equipment), 15 (fume/odour emission scheme), 16 (litter disposal), 21 (validation report), 28 (footway reconstruction), 29 (external materials/finishes), 30 (large scale details), 32 (acoustic barrier), 37 (BREEAM), 38 (renewable/low carbon energy), 39 (surface water discharge), 40 (suitable access), 41 (refuse/recycling storage facilities), 42 (car parking accommodation), 43 (hard/soft landscaping), 44 (landscape works), and 45 (privacy screening) relating to planning permission 23/04004/FULConditionsReceived 17 Jul 202623/04004/COND1
Planning in Wincobank
- Approved
- 81%
- 13 of 14 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of Wincobank in the last 24 months, from Sheffield City Council's planning register.
Decided by Sheffield City CouncilCouncil page
Around Wincobank
Postcode districts
S9 158 applications in the last 12 monthsS5 119 applications in the last 12 monthsS61 37 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Sheffield City Council
For home projects and trades
- Architects in WincobankFor planning applications, extensions and new builds.
- Building contractors in WincobankLocal builders for approved plans and permitted development.
Builders and trades: get new Wincobank jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Wincobank
Wincobank is a district within the Shiregreen and Brightside ward of Sheffield, South Yorkshire, which encompasses the areas of Brightside, Shiregreen, and Wincobank itself. Covering 6.5 km² in the northern part of the city, the ward had a population of 20,826 across 8,696 households as of the 2011 census. It is part of the Sheffield Brightside and Hillsborough parliamentary constituency, making it a notable area for those researching planning applications and local developments.
There are currently no active flood warnings for the Wincobank area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Wincobank a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Wincobank has 5 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Wincobank planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Wincobank, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 40 planning applications were submitted near Wincobank. Of these, 81% were approved, with an average decision time of 68 days.
The most common types were discharge of conditions (9), outline applications (3), amendments (2).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).