Search Carbrook planning applications
14 applications received or decided in the last 90 days · within 1 km of the centre of Carbrook · updated daily · Sheffield City Council
- Sheffield International Venues Ltd Car Park Greenland Road Sheffield S9 5HHAwaiting decisionErection of a two-storey office/welfare building and pattern store building ancillary to the existing buildings/manufacturing operations of the adjacent land and associated works (Application under Section 73 to vary condition number(s): 4 (Intrusive Investigations), 10 (Remediation), 16 (External Materials) and 17 (Large Scale Details) imposed by planning permission 23/02975/FUL)Received 9 Nov 202626/03236/FUL
- Land Between Weir Head Carbrook Street And Weedon Street Sheffield S9 2FTAwaiting decisionConstruction of new industrial buildings, security building and fencing, surface car parking and revised access arrangements, including associated landscaping, service areas and other associated works (Application under Section 73 to vary condition 2 (Approved Plans) imposed by planning permission 24/02184/FUL)Received 30 Oct 202626/03167/FUL
- Victory Park 175 Upwell Street Sheffield S4 8BRAwaiting decisionInstallation of external plant with boundary fencing, safety barriers and an external escape stair, and formation of a new external doorReceived 28 Oct 202626/03253/FUL
- Sheffield Forgemasters Ltd Steel Works River Don Works Brightside Lane Sheffield S9 2SPAwaiting decisionDismantling of 2 No. existing brick piers for repair and like for like rebuild, and refurbishment of existing wallReceived 27 Oct 202626/03070/LBC
- Jamiyat Tablig Ul Islam Mosque 30 Bodmin Street Sheffield S9 3TAAwaiting decisionApplication under section 73 to vary condition 2 (Approved Plans) Alteration of entrance area and additional extensions - imposed by planning permission 22/03241/FUL - Two-storey extension to existing mosqueReceived 21 Oct 202626/03156/FUL
Planning in Carbrook
- Approved
- 92%
- 58 of 60 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Carbrook in the last 24 months, from Sheffield City Council's planning register.
Decided by Sheffield City CouncilCouncil page
Around Carbrook
Postcode districts
S9 158 applications in the last 12 monthsS4 98 applications in the last 12 monthsS10 403 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Sheffield City Council
For home projects and trades
- Architects in CarbrookFor planning applications, extensions and new builds.
- Building contractors in CarbrookLocal builders for approved plans and permitted development.
Builders and trades: get new Carbrook jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Carbrook
Carbrook is an industrial suburb located in Sheffield, South Yorkshire, just southeast of Brightside. Historically named after the Carr Brook, which flowed through the area until the late 18th century, Carbrook presents various opportunities for planning applications, particularly in the industrial sector.
There are currently no active flood warnings for the Carbrook area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Carbrook a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Carbrook has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Carbrook planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Carbrook, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 109 planning applications were submitted near Carbrook. Of these, 92% were approved, with an average decision time of 52 days.
The most common types were discharge of conditions (38), amendments (12), outline applications (9). 1 large-scale development was submitted during this period.
3 planning appeals were lodged, of which 2 were allowed and 1 was dismissed (67% success rate).