Search Quick planning applications
22 applications received or decided in the last 12 months · within 1 km of the centre of Quick · updated daily · Tameside Metropolitan Borough Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- Land At The Corner Of Manchester Road And Spring Mill Drive Mossley Tameside OL5 9BGAwaiting decisionProposed 2 No. detached dwellingsReceived 5 Nov 202626/00834/FUL
- 1 Canalside Close Mossley Tameside OL5 9GHAwaiting decisionSingle storey rear infill extension garage conversion and relocation of 2m front fence to boundaryReceived 4 Nov 202626/00840/FUL
- 419 Manchester Road Mossley Tameside OL5 9BGApprovedProposed single storey ground floor rear extensionReceived 17 Sep 2026Decided 14 Oct 202626/00725/FUL
- Boundary Walls To Woodend Mill Dark Lane Mossley Tameside OL5 9ATApprovedListed Building Consent: Boundary walls located within the curtilage of Woodend Mill, taken down to footings to install / improve pipework below ground. The walls will be rebuilt using the existing stones, damaged stones replaced with reclaimed stone where required so not to alter the appearance of the walls.Received 28 Aug 2026Decided 23 Oct 202626/00658/LBC
- Hole House Farm Huddersfield Road Mossley Tameside OL5 9BTApprovedFull discharge of condition 5 (Drainage) of planning reference 24/00104/FULFormal Discharge Of Planning ConditionsReceived 4 Aug 2026Decided 30 Sep 202626/00077/PLCOND
Planning in Quick
- Approved
- 86%
- 31 of 34 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Quick in the last 24 months, from Tameside Metropolitan Borough Council's planning register.
Decided by Tameside Metropolitan Borough CouncilCouncil page
Around Quick
Postcode districts
OL5 46 applications in the last 12 monthsOL3 123 applications in the last 12 monthsOL4 187 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Tameside Metropolitan Borough Council
For home projects and trades
- Architects in QuickFor planning applications, extensions and new builds.
- Building contractors in QuickLocal builders for approved plans and permitted development.
Builders and trades: get new Quick jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Quick
Quick is a settlement located in Greater Manchester, England.
Property prices in Quick show an average sale price of £187,380, based on 50 recent transactions recorded by HM Land Registry. There are currently no active flood warnings for the Quick area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Quick a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Quick has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Quick planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near Quick, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 44 planning applications were submitted near Quick. Of these, 86% were approved, with an average decision time of 60 days.
The most common types were full planning applications (8), outline applications (6), discharge of conditions (5). 1 large-scale development was submitted during this period.
2 planning appeals were lodged, of which 0 were allowed and 2 were dismissed (0% success rate).