Search New Town (ME19) planning applications
26 applications received or decided in the last 90 days · within 1 km of the centre of New Town (ME19) · updated daily · Tonbridge and Malling Borough Council
- 16 Town Hill West Malling Kent ME19 6QNAwaiting decision1 x Copper Beech (applicants ref. T1) - Overall crown reduction of 2m.Received 9 Nov 202626/02105/TNCA
- 181 St Leonards Street West Malling Kent ME19 6PEAwaiting decisionListed Building Application : Proposed conversion of an historic Oast house, works to include the enclosure of the existing external staircase; alterations to the non-original roof and walls at the top of the roundel. Replacement of non-original external doors. Internal alterations to the layout at first floor, including the insertion of a kitchen and en-suite; and upgrading the fabric of the building to introduce some insulation, replacing some of the non-original windows, and overhauling the roof finishReceived 14 Oct 202626/01937/LB
- 181 St Leonards Street West Malling Kent ME19 6PEAwaiting decisionProposed conversion of an historic Oast house, works to include the enclosure of the existing external staircase; alterations to the non-original roof and walls at the top of the roundel. Replacement of non-original external doors. Internal alterations to the layout at first floor, including the insertion of a kitchen and en-suite; and upgrading the fabric of the building to introduce some insulation, replacing some of the non-original windows, and overhauling the roof finishReceived 14 Oct 202626/01936/FL
- 43 Swan Street West Malling Kent ME19 6HFAwaiting decisionListed Building Application (retrospective) For the installation of an automated defribrillator on the front elevationReceived 14 Oct 202626/01844/LB
- The Mallings 247 London Road West Malling Kent ME19 5ADAwaiting decision1x Beech (circled on applicants plan) - Reduce by 25% (around 2 metre reduction). T4 of Tree Preservation OrderReceived 7 Oct 202626/01830/TPOC
Planning in New Town (ME19)
- Approved
- 95%
- 42 of 43 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of New Town (ME19) in the last 24 months, from Tonbridge and Malling Borough Council's planning register.
Decided by Tonbridge and Malling Borough CouncilCouncil page
Around New Town (ME19)
Postcode districts
ME19 231 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Tonbridge and Malling Borough Council
For home projects and trades
- Architects in New TownFor planning applications, extensions and new builds.
- Building contractors in New TownLocal builders for approved plans and permitted development.
Builders and trades: get new New Town jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About New Town (ME19)
New Town is a settlement located in Kent, England.
Property prices in New Town show an average sale price of £449,850, based on 50 recent transactions recorded by HM Land Registry.
The area around New Town has 20 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, New Town planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near New Town, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 69 planning applications were submitted near New Town. Of these, 95% were approved, with an average decision time of 72 days.
The most common types were tree works (12), outline applications (10), full planning applications (6). 1 large-scale development was submitted during this period.