Search Middleton One Row planning applications
28 applications received or decided in the last 12 months · within 1 km of the centre of Middleton One Row · updated daily · Darlington Borough Council
Only 9 applications in the last 90 days, so this shows the last 12 months.
- Street Record Middleton Lane Middleton St George DarlingtonAwaiting decisionUpgrade of 14 No. spans of open wire to 120 mm ABC with associated pole and stay replacmentsReceived 3 Nov 202626/01080/OHL
- 3 Tower Hill Church Lane Middleton St George Darlington DL2 1DUAwaiting decisionFelling of 1 no. Wellingtonia (T1) protected under Tree Preservation Order (No.6) 1973 G5Received 9 Oct 202626/01001/TF
- Foxlands Devonport Gardens Middleton One Row Darlington DL2 1ARAwaiting decisionRemoval of conservatory and erection of a single storey extension to the side elevation, window and door alterations including replacing dormer windows with roof lights, installation of external wood burner flue, together with associated worksReceived 9 Oct 202626/00994/FUL
- 18 Church Lane Middleton St George Darlington DL2 1DFApprovedProposed felling of a 1 No Ash tree within a conservation area under a 5 day notice exemptionTree Felling/5 Day NoticeReceived 29 Sep 2026Decided 29 Sep 202626/00967/TF5D
- 14 Hill Rise Middleton One Row Darlington DL2 1AZApprovedNotification to carry out works to trees in a designated conservation area - felling of 1 no. Laburnum & 1 no. Hawthorn and crown reshape 1 no Crab AppleReceived 23 Sep 2026Decided 30 Oct 202626/00945/TFC
Planning in Middleton One Row
- Approved
- 97%
- 36 of 36 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Middleton One Row in the last 24 months, from Darlington Borough Council's planning register.
Decided by Darlington Borough CouncilCouncil page
Around Middleton One Row
Postcode districts
DL2 287 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Darlington Borough Council
For home projects and trades
- Architects in Middleton One RowFor planning applications, extensions and new builds.
- Building contractors in Middleton One RowLocal builders for approved plans and permitted development.
Builders and trades: get new Middleton One Row jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Middleton One Row
Middleton One Row is a picturesque village located in the borough of Darlington, County Durham, approximately 4 miles southeast of Darlington town centre. Originally established in the late 18th century as a spa resort, the village features properties along a single row that beautifully overlook the banks of the River Tees, making it a unique area for planning applications and development opportunities.
There are currently no active flood warnings for the Middleton One Row area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Middleton One Row a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Middleton One Row planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Middleton One Row, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 51 planning applications were submitted near Middleton One Row. Of these, 97% were approved, with an average decision time of 40 days.
The most common types were tree works (6), outline applications (3), discharge of conditions (2). 3 large-scale developments were submitted during this period.
3 planning appeals were lodged, of which 2 were allowed and 1 was dismissed (67% success rate).