Search Low Dinsdale planning applications
13 applications received or decided in the last 12 months · within 1 km of the centre of Low Dinsdale · updated daily · Darlington Borough Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- 1 Riverbanks Dinsdale Park Middleton St George Darlington DL2 1UBAwaiting decisionWorks to a tree protected under Tree Preservation Order 1987 (No.4) T7 - 1 no. Lime - crown lift by 5m to clear building and highwayReceived 29 Oct 202626/01063/TF
- 4 Riverbanks Dinsdale Park Middleton St George Darlington DL2 1UBAwaiting decisionWorks to a tree protected under Tree Preservation Order 1987 No.4 (T11) - 1 no. Lime - reduction in height by approx. 2/3m to remove deadwoodReceived 29 Oct 202626/01062/TF
- 3 Tower Hill Church Lane Middleton St George Darlington DL2 1DUAwaiting decisionFelling of 1 no. Wellingtonia (T1) protected under Tree Preservation Order (No.6) 1973 G5Received 9 Oct 202626/01001/TF
- 18 Church Lane Middleton St George Darlington DL2 1DFApprovedProposed felling of a 1 No Ash tree within a conservation area under a 5 day notice exemptionTree Felling/5 Day NoticeReceived 29 Sep 2026Decided 29 Sep 202626/00967/TF5D
- 19 Church Lane Middleton St George Darlington DL2 1DFApprovedNotification to carry out works to trees in a designated conservation area - 3 no. Silver Birch reduce height to approx 6-8m and remove lower overhanging branches on 1 no. Silver BirchReceived 18 Sep 2026Decided 27 Oct 202626/00930/TFC
Planning in Low Dinsdale
- Approved
- 100%
- 23 of 23 decided
- Decision time
- about 6 weeks
- on average
Applications within 1 km of the centre of Low Dinsdale in the last 24 months, from Darlington Borough Council's planning register.
Decided by Darlington Borough CouncilCouncil page
Around Low Dinsdale
Postcode districts
DL2 286 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Darlington Borough Council
For home projects and trades
- Architects in Low DinsdaleFor planning applications, extensions and new builds.
- Building contractors in Low DinsdaleLocal builders for approved plans and permitted development.
Builders and trades: get new Low Dinsdale jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Low Dinsdale
Low Dinsdale is a village located in the borough of Darlington, County Durham, England, just a few miles southeast of Darlington. Formerly a civil parish, it was merged with Neasham and Middleton St. George on 1 April 2016. Those researching planning applications in this area should note its integration into the broader parish structure.
There are currently no active flood warnings for the Low Dinsdale area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Low Dinsdale a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Low Dinsdale has 2 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Low Dinsdale planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Low Dinsdale, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 33 planning applications were submitted near Low Dinsdale. Of these, 100% were approved, with an average decision time of 42 days.
The most common types were tree works (4), outline applications (2), full planning applications (1).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).