Search Foreland Fields planning applications
15 applications received or decided in the last 90 days · within 1 km of the centre of Foreland Fields · updated daily · Isle of Wight Council
- 5 Brook Furlong Bembridge Isle Of Wight PO35 5QRAwaiting decisionProposed single storey rear and roof extension to include loft conversion to form additional living accommodation; proposed alterations to external materialsReceived 26 Oct 202626/01487/HOU
- Foredeck Beach House Lane Bembridge Isle Of Wight PO35 5TAAwaiting decisionProposed single storey front and rear extensions; first floor front and side extensions to include balcony; roof extension and alterations to include dormer window on front elevation and balcony; alterations to include cladding of first floorReceived 22 Oct 202626/01304/HOU
- 1 The Drive Bembridge Isle Of Wight PO35 5XLAwaiting decisionVariation of condition 2 on 26/00457/HOU to allow for alterations to approved schemeReceived 8 Oct 202626/01403/RVC
- 120 Howgate Road Bembridge Isle Of Wight PO35 5QZAwaiting decisionProposed swimming poolReceived 8 Oct 202626/01404/HOU
- Oak House Lane End Road Bembridge Isle Of Wight PO35 5SZAwaiting decisionT1 and T2; Oak(Quercus Robur) x 2. Repollard to old pruning points Reason: Trees are encroaching house and casting excessive shade.Received 2 Oct 202626/01376/TW
Planning in Foreland Fields
- Approved
- 92%
- 55 of 58 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Foreland Fields in the last 24 months, from Isle of Wight Council's planning register.
Decided by Isle of Wight CouncilCouncil page
Around Foreland Fields
Postcode districts
PO35 89 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Isle of Wight Council
For home projects and trades
- Architects in Foreland FieldsFor planning applications, extensions and new builds.
- Building contractors in Foreland FieldsLocal builders for approved plans and permitted development.
Builders and trades: get new Foreland Fields jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Foreland Fields
Foreland Fields, the easternmost point of the Isle of Wight, is part of the village of Bembridge and lies approximately 6.5 miles south of Portsmouth, across the Solent. This picturesque area features the Crab and Lobster Inn, known for its maritime history and shipwreck photographs, along with beach huts, a beach café, and a coast guard lookout. The surrounding waters are abundant with marine life, including edible crabs and mackerel, making it a notable spot for both locals and visitors interested in coastal planning applications and developments.
There are currently no active flood warnings for the Foreland Fields area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Foreland Fields a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Foreland Fields has 8 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Foreland Fields planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Foreland Fields, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 77 planning applications were submitted near Foreland Fields. Of these, 92% were approved, with an average decision time of 58 days.
The most common types were full planning applications (18), tree works (18), discharge of conditions (8).
2 planning appeals were lodged, of which 0 were allowed and 2 were dismissed (0% success rate).