Search Darnall planning applications
12 applications received or decided in the last 90 days · within 1 km of the centre of Darnall · updated daily · Sheffield City Council
- Sheffield International Venues Ltd Car Park Greenland Road Sheffield S9 5HHAwaiting decisionErection of a two-storey office/welfare building and pattern store building ancillary to the existing buildings/manufacturing operations of the adjacent land and associated works (Application under Section 73 to vary condition number(s): 4 (Intrusive Investigations), 10 (Remediation), 16 (External Materials) and 17 (Large Scale Details) imposed by planning permission 23/02975/FUL)Received 9 Nov 202626/03236/FUL
- 18 Basford Close Sheffield S9 5BXAwaiting decisionErection of single-storey side/rear extension to dwellinghouseReceived 26 Oct 202626/03215/FUL
- 39 Barnardiston Road Sheffield S9 4RWAwaiting decisionDemolition of existing rear outbuilding and erection of a replacement single-storey ancillary outbuilding within the curtilage of the dwellinghouseReceived 2 Oct 202626/02949/FUL
- Land Behind 6 To 30 Poole Place Between Cressewll Road And Prince Of Wales Road Cresswell Road Sheffield S9 4EUAwaiting decisionApplication to approve details in relation to condition numbers: 4 (Network Rail), 5 (Invasive Species Management Plan), 6 (Landscape and Ecological Management Plan), 8 (Phase II Intrusive Site Investigation Report), 10 (Renewable/Low Carbon Energy), 13 (Surface Water Drainage), 18 (Lighting), 19 (External Materials and Finishes), 20 (Car Parking Accommodation), 22 (Bin Storage) and 25 (Hard and Soft Landscape Scheme) relating to planning permission 23/04021/FULReceived 2 Oct 202623/04021/COND2
- Design, Prototype, Manufacture And Supply Limited 313 Coleford Road Sheffield S9 5NFAwaiting decisionErection of a steel framed rear extension with mezzanine floorReceived 20 Aug 202626/02409/FUL
Planning in Darnall
- Approved
- 80%
- 20 of 23 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Darnall in the last 24 months, from Sheffield City Council's planning register.
Decided by Sheffield City CouncilCouncil page
Around Darnall
Postcode districts
S9 158 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Sheffield City Council
For home projects and trades
- Architects in DarnallFor planning applications, extensions and new builds.
- Building contractors in DarnallLocal builders for approved plans and permitted development.
Builders and trades: get new Darnall jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Darnall
Darnall is a vibrant suburb located in eastern Sheffield, South Yorkshire, approximately 3 miles (5 km) from the city centre. Its proximity to Sheffield makes it an area of interest for planning applications, as it continues to develop and evolve within the urban landscape.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Darnall a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Darnall has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Darnall planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Darnall, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 56 planning applications were submitted near Darnall. Of these, 80% were approved, with an average decision time of 60 days.
The most common types were discharge of conditions (12), outline applications (5), amendments (3).
2 planning appeals were lodged, of which 1 was allowed and 1 was dismissed (50% success rate).