Search Carol Green planning applications
12 applications received or decided in the last 12 months · within 1 km of the centre of Carol Green · updated daily · Solihull Metropolitan Borough Council
Only 2 applications in the last 90 days, so this shows the last 12 months.
- Land At Little Beanit Farm Waste Lane Balsall Common SolihullAwaiting decisionRetrospective application for a temporary construction access track for a Battery Energy Storage System.Received 16 Oct 2026PL/2026/01884/PPFL
- Jasmine Cottage Truggist Lane Berkswell Solihull CV7 7BXAwaiting decisionDemolition of existing cottage and replacement with new dwelling in revised location including new access for proposed dwelling and adjacent property.Received 11 Aug 2026PL/2026/01468/PPFL
- Heron Bank Spencers Lane Berkswell Solihull CV7 7SWAwaiting decisionDischarge condition Nos. 3 (Parts 4-6) (Contaminated Land) and 5 (Cycle Storage) following planning approval PL/2024/02506/PNCUDW dated 19.12.2024 for Prior notification for a change of use from agricultural building to 5 No. dwellings.Received 30 Jul 2026PL/2026/01422/DIS
- Heron Bank Spencers Lane Berkswell Solihull CV7 7SWAwaiting decisionDischarge condition Nos. 4 (Landscaping) and 12 (Parts 5-7)(Contaminated Land) following planning approval PL/2024/02780/PPFL dated 24.02.2025 for Demolition of existing agricultural building and erection of two dwellings (semi-detached) with associated car parking and amenity space.Discharge of ConditionsReceived 28 Jul 2026PL/2026/01410/DIS
- Elmdon Benton Green Lane Berkswell Solihull CV7 7AXApprovedSingle storey side/rear extension, front bay window extension and associated alterations.Received 24 Jul 2026Decided 2 Oct 2026PL/2026/01284/MINFHO
Planning in Carol Green
- Approved
- 92%
- 11 of 12 decided
- Decision time
- about 14 weeks
- on average
Applications within 1 km of the centre of Carol Green in the last 24 months, from Solihull Metropolitan Borough Council's planning register.
Decided by Solihull Metropolitan Borough CouncilCouncil page
Around Carol Green
Postcode districts
CV7 283 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Solihull Metropolitan Borough Council
For home projects and trades
- Architects in Carol GreenFor planning applications, extensions and new builds.
- Building contractors in Carol GreenLocal builders for approved plans and permitted development.
Builders and trades: get new Carol Green jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Carol Green
Carol Green is a settlement located in West Midlands, England.
There are currently no active flood warnings for the Carol Green area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Carol Green a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Carol Green has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Carol Green planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Carol Green, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 17 planning applications were submitted near Carol Green. Of these, 92% were approved, with an average decision time of 96 days.
The most common types were discharge of conditions (6), full planning applications (4), outline applications (3).