Search Blackwater planning applications
26 applications received or decided in the last 90 days · within 1 km of the centre of Blackwater · updated daily · Hart District Council
- 27 Frogmore Park Drive Blackwater Camberley Hampshire GU17 0PGAwaiting decisionG1. Scotts Pine - Reduce the lowest branches to give approx 3m clearance to the dwellings either side of the group by cutting back to suitable growth points and to give clearance to the telephone wires as required.Received 4 Nov 202626/01868/TPO
- Camberley Sewage Treatment Works Watchmoor Park Riverside Way Camberley SurreyApprovedConsultation application from Surrey County Council for the erection and use of welfare building. (this application is determined by Surrey County Council under their ref SCCRef-2026-0171 - this record is for consultation only)Received 23 Oct 2026Decided 11 Nov 202626/0990/PCM
- Camberley Sewage Treatment Works Watchmoor Park Riverside Way Camberley SurreyAwaiting decisionErection and use of welfare building (this application is determined by Surrey County Council under their ref SCCRef-2026-0171)Received 23 Oct 202626/0989/DCM
- 110 Kingsway Blackwater Camberley Hampshire GU17 0JDAwaiting decisionReplacement of window with front door and window and front door with window to include the removal of the porch roof and replacement of the tiles on the front roofslope with claddingReceived 21 Oct 202626/01262/HOU
- Unit 6 Watchmoor Point Camberley Surrey GU15 3ADAwaiting decisionSubmission of details to comply with condition 10 (Electric Vehicle charging point) and 15 (external lighting) planning permission 25/1029/FFU for Facade alterations to the existing Classes B2/B8 unit, reconfiguration of parking facilities, loading yard, landscaping and the formation of a new access road from Watchmoor Road.Received 13 Oct 202626/0942/DTC
Planning in Blackwater
- Approved
- 85%
- 56 of 63 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Blackwater in the last 24 months, from Hart District Council's planning register.
Decided by Hart District CouncilCouncil page
Around Blackwater
Postcode districts
GU17 74 applications in the last 12 monthsGU15 514 applications in the last 12 monthsGU47 70 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Hart District Council
For home projects and trades
- Architects in BlackwaterFor planning applications, extensions and new builds.
- Building contractors in BlackwaterLocal builders for approved plans and permitted development.
Builders and trades: get new Blackwater jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Blackwater
Blackwater is a town located in the Hart District of Hampshire, England, and is part of the Farnborough/Aldershot Built-up Area. Situated approximately 32 miles (51 km) west-southwest of London, it is nearly contiguous with Camberley, making it an important area for planning applications and development within the region. The settlement has a population of approximately 7,169. It sits within the Blackwater and Hawley district.
The area around Blackwater has 8 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Blackwater planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Blackwater, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 130 planning applications were submitted near Blackwater. Of these, 85% were approved, with an average decision time of 58 days.
The most common types were full planning applications (11), outline applications (10), amendments (8).