Search Battersea planning applications
99 applications received or decided in the last 90 days · within 1 km of the centre of Battersea · updated daily · London Borough of Wandsworth
- 8 Lillieshall Road London SW4 0LPAwaiting decisionApplication for Full Planning Permission for the excavation of existing basement with the formation of 2 lightwells. Alteration to fenestration including replacement of existing first floor windows and refurbishment of existing ground floor windows.Received 5 Nov 202626/03265/FUL
- 8 Lillieshall Road London SW4 0LPAwaiting decisionApplication for Listed Building Consent for the excavation of existing basement with the formation of 2 lightwells. Alteration to fenestration including replacement of existing first floor windows and refurbishment of existing ground floor windows. (Full Planning Permission ref: 26/03265/FUL application received).Received 5 Nov 202626/03266/LB
- 3, Lurline Gardens, London, SW11 4DEAwaiting decisionAlterations including erection of mansard roof extenson to main rear roof and exReceived 4 Nov 2026PA2026/0345
- Eustace Building 372 Queenstown Road SW11 8NTAwaiting decisionDetails of materials pursuant to condition 4 (back painted colour treatment) ofDetails (following full perm.)Received 4 Nov 20262026/2920
- 3 Wardell Mews London SW4 0ARAwaiting decisionCertificate of Lawful Development (Proposed) with respect to installation of Air Source Heat Pump at roof level.Received 4 Nov 202626/03228/LDCP
Planning in Battersea
- Approved
- 87%
- 621 of 688 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of Battersea in the last 24 months, from London Borough of Wandsworth's planning register.
Decided by London Borough of WandsworthCouncil page
Around Battersea
Postcode districts
SW11 739 applications in the last 12 monthsSW8 457 applications in the last 12 monthsSW4 542 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: London Borough of Wandsworth
For home projects and trades
- Architects in BatterseaFor planning applications, extensions and new builds.
- Building contractors in BatterseaLocal builders for approved plans and permitted development.
Builders and trades: get new Battersea jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Battersea
Battersea is a prominent district in southwest London, situated within the London Borough of Wandsworth, approximately 3.5 miles from Charing Cross. This vibrant area stretches along the south bank of the Thames Tideway and features the expansive 200-acre Battersea Park, making it a key location for potential planning applications involving residential, commercial, and recreational developments.
There are currently no active flood warnings for the Battersea area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Battersea a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Battersea planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Battersea, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 896 planning applications were submitted near Battersea. Of these, 87% were approved, with an average decision time of 76 days.
The most common types were full planning applications (130), tree works (58), outline applications (49). 7 large-scale developments were submitted during this period.
20 planning appeals were lodged, of which 9 were allowed and 10 were dismissed (47% success rate).