Search Barwick in Elmet planning applications
28 applications received or decided in the last 12 months · within 1 km of the centre of Barwick in Elmet · updated daily · Leeds City Council
Only 9 applications in the last 90 days, so this shows the last 12 months.
- 62 The Boyle Barwick In Elmet Leeds LS15 4JNAwaiting decisionReduce all trees and shrubs down to 2m along the top of the embankment.Received 14 Oct 202626/05817/TR
- Elmet Screencraft Ltd Rakehill Road Barwick In Elmet Leeds LS15 4JLAwaiting decisionRemove trees T1, G2, T3, G4 (x2), T5 and T6Received 13 Oct 202626/05783/TR
- 60 Main Street Barwick In Elmet Leeds LS15 4JGAwaiting decisionVariation of condition 2 (Approved Plans) to previously approved Planning Application 26/02159/FU (Demolition of existing porch to front and erection of new porch to front with pitched roof) for proposed side elevations of new porch to be changed from stone to render to match existing propertyReceived 12 Oct 202626/05740/FU
- 1 Schoolgate Barwick In Elmet Leeds LS15 4PFApprovedT1 Beech: Crown lift to 3m above ground level and prune to give 2m clearance from the property. G1 Sycamore: Group Crown lift to 5.2m above the highway and 2.5m above the footpath.Received 18 Sep 2026Decided 20 Oct 202626/05237/TR
- Playground Welfare Avenue Barwick In Elmet Leeds LS15 4PFWithdrawnUpgrade and extension of the playgroundReceived 14 Sep 2026Decided 2 Nov 202626/04628/FU
Planning in Barwick in Elmet
- Approved
- 76%
- 35 of 42 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Barwick in Elmet in the last 24 months, from Leeds City Council's planning register.
Decided by Leeds City CouncilCouncil page
Around Barwick in Elmet
Postcode districts
LS15 275 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Leeds City Council
For home projects and trades
- Architects in Barwick in ElmetFor planning applications, extensions and new builds.
- Building contractors in Barwick in ElmetLocal builders for approved plans and permitted development.
Builders and trades: get new Barwick in Elmet jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Barwick in Elmet
Barwick-in-Elmet is a village located in the civil parish of Barwick in Elmet and Scholes, within the Leeds district of West Yorkshire, England. Situated just 7 miles east of Leeds city centre, it is one of only three locations linked to the historic Romano-British kingdom of Elmet, alongside Scholes-in-Elmet and Sherburn-in-Elmet. This rich historical context may influence planning applications in the area, making it a noteworthy site for development considerations.
There are currently no active flood warnings for the Barwick in Elmet area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Barwick in Elmet a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Barwick in Elmet planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Barwick in Elmet, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 52 planning applications were submitted near Barwick in Elmet. Of these, 76% were approved, with an average decision time of 53 days.
The most common types were full planning applications (29), tree works (8), outline applications (3).