Search Barton planning applications
26 applications received or decided in the last 12 months · within 1 km of the centre of Barton · updated daily · Torbay Council
Only 3 applications in the last 90 days, so this shows the last 12 months.
- 6 Helens Mead Close Torquay TQ2 8PBAwaiting decisionConstruction of single storey rear extension with rear platform and steps.Received 30 Sep 2026P/2026/0432
- Claddon Lane Great Hill Torquay TQ2 8QEAwaiting decisionInstallation of a 10kVA generator on concrete base, with power duct. Wide cable trunking to be installed on concrete base. AMF panel to be installed on new pole. Vertiv PSU cabinet to be retained. Roxtec gland to be installed. Concrete collar to be installed.Received 18 Aug 2026P/2026/0511
- The Maples Footland Lane Daccombe Devon TQ12 4STRefusedRetrospective permission for proposed bird hideReceived 14 Jul 202626/01125/FUL
- 6 Linacre Road Torquay TQ2 8LEApprovedDemolition of garage and outbuilding and construction of side extension, the blocking up of the existing driveway and the installation of driveway and vehicle access.Received 5 Jun 2026Decided 21 Jul 2026P/2026/0362
- 3 Overdale Close Torquay TQ2 8RDApprovedT001 - Atlas Cedar (Cedrus atlantica): Undertake a light, sympathetic lateral crown reduction of approximately 1.0-1.5 metres on the dwelling-facing aspect only in order to reduce encroachment toward the adjacent property and maintain a suitable spatial relationship with the building. Works to retain the tree's natural form and balanced crown structure, with an estimated post-work crown spread of approximately 6.5-7.0 metres on the pruned aspect and approximately 8.0 metres elsewhere throughout the retained canopy. Concurrent removal of significant deadwood over identified target areas, including adjacent dwellings and gardens, is also proposed as part of routine tree management. The proposed works are considered minor and proportionate arboricultural management intended to implement early-stage crown maintenance through small diameter pruning cuts, thereby avoiding the need for more extensive pruning works in the future. All works are to be undertaken in accordance with BS3998:2010 by suitably qualified and insured arboricultural contractors.Received 26 May 2026Decided 20 Jul 2026AT/2026/0138
Planning in Barton
- Approved
- 88%
- 22 of 24 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of Barton in the last 24 months, from Torbay Council's planning register.
Decided by Torbay CouncilCouncil page
Around Barton
Postcode districts
TQ2 231 applications in the last 12 monthsTQ12 413 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Torbay Council
For home projects and trades
- Architects in BartonFor planning applications, extensions and new builds.
- Building contractors in BartonLocal builders for approved plans and permitted development.
Builders and trades: get new Barton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Barton
Barton is a settlement located in Devon, England.
There are currently no active flood warnings for the Barton area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Barton a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Barton has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Barton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Barton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 33 planning applications were submitted near Barton. Of these, 88% were approved, with an average decision time of 68 days.
The most common types were full planning applications (2), tree works (1), discharge of conditions (1).
1 planning appeal was lodged, of which 0 were allowed and 1 was dismissed (0% success rate).