Search Arbury planning applications
66 applications received or decided in the last 90 days · within 1 km of the centre of Arbury · updated daily · Cambridge City Council
- Chamberlin Court Westfield Lane Cambridge Cambridgeshire CB4 3QXAwaiting decisionT1 - Silver Birch - Crown reduce in height by 5m - Tree is blocking out light to windows Flat 16Received 4 Nov 202626/1303/TTCA
- 73 Oxford Road Cambridge Cambridgeshire CB4 3PHAwaiting decisionS73 to vary condition 2 (approved plans) of ref: 25/04720/HFUL (Single storey side and rear extension, including 2no. rooflights. Replacement of existing juliette balcony and 1no. rear window with 2no. windows.) to allow revision of the ground floor internal layout, including the addition of a small opaque window to the wc and a door to the utility room.Received 4 Nov 202626/04147/S73
- 114 Huntingdon Road Cambridge Cambridgeshire CB3 0HLAwaiting decisionT3 LIMES x 9ms tall, previously pollarded - repollard, equating to reduction of 2.5ms regrowth to leave tree at 5.5ms tall as part of pollarding management regime of pollarded crown.Received 4 Nov 202626/1259/TTPO
- 40 Searle Street Cambridge Cambridgeshire CB4 3DBAwaiting decisionA - Olive tree - Crown-reduce approximately 1.5m, which will leave the tree at 6m. Shorten lateral branches by 1m, and remove two crossing branches.Received 3 Nov 202626/1290/TTCA
- 66 Victoria Park Cambridge Cambridgeshire CB4 3ELAwaiting decisionRoof extension and rear roof enlargement, installation of conservation rooflights and associated worksReceived 29 Oct 202626/03925/HFUL
Planning in Arbury
- Approved
- 88%
- 313 of 340 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Arbury in the last 24 months, from Cambridge City Council's planning register.
Decided by Cambridge City CouncilCouncil page
Around Arbury
Postcode districts
CB4 383 applications in the last 12 monthsCB3 366 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Cambridge City Council
For home projects and trades
- Architects in ArburyFor planning applications, extensions and new builds.
- Building contractors in ArburyLocal builders for approved plans and permitted development.
Builders and trades: get new Arbury jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Arbury
Arbury is a vibrant suburb and electoral ward within Cambridge, England, boasting a population of 9,883 as recorded in the 2021 UK census. This area is significant for planning applications due to its residential character and ongoing developments, making it an important consideration for prospective developers and planners.
There are currently no active flood warnings for the Arbury area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (September 2026). This makes Arbury a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Arbury has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Arbury planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Arbury, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 454 planning applications were submitted near Arbury. Of these, 88% were approved, with an average decision time of 56 days.
The most common types were full planning applications (140), discharge of conditions (130), tree works (89). 1 large-scale development was submitted during this period.
7 planning appeals were lodged, of which 1 was allowed and 6 were dismissed (14% success rate).