Planning applications in EX10
We hold 729 planning applications for the EX10 postcode area, 130 of them submitted in the past year. 89% of decided applications here were approved. A decision typically takes 48 days. The area is covered by East Devon, Devon.
Towns and villages in EX10
Councils covering EX10
Recent applications in EX10
Rebuild the brick and stone wall using salvaged bricks/stone and shortfall using reclaimed bricks and locally sourced stone to match; rebuild stone wall using and pillar to the rear re-using existing where possible and source additional to match; rebuild pillar using brick and stone.
T1 - Sycamore: crown lift to 3m, crown reduce western aspect to achieve a 2m clearance from building. T376 - Lime: remove damaged lower branches to secondary growth points, crown lift to 2.5m and sympathetically lift to 5.2m over road, sever Ivy at base of tree.
Proposed side and rear single storey extensions
Discharge of condition for 25/2420/FUL: Condition 4 (Tree Protection) and Condition 7 (Materials)
Environmental Impact Assessment Screening Opinion relating to development proposed under application 26/0665/MFUL (Demolition of shower block and installation of 59 bases for the siting of static caravans with decking; retention of an existing tree house; change of use of existing building to spa/gym and reception; all with associated access, landscaping, car parking, drainage and infrastructure works (above and below ground)).
Sycamore : dismantle and remove down to ground level due to large cavity at the base of the tree.
Beech trees T1, T2 and T3 - fell.
Variation of condition 2 (approved plans) on planning permission 25/2086/FUL (Increase in roof pitch, addition of dormers to the South elevation, roof lights and dormer window on the North elevation and addition of cladding) Changes to footprint, external materials and fenestration, and the addition of Juliette Balconies on south elevation
Addition of a garden room, and some design changes to the previously approved single-storey extension on 26/0366/LBC & 26/0367/FUL
Construction of a first floor extension on East elevation.
Installation of new timber gates and replacement of existing windows
Discharge of Condition for 25/0575/VAR: Condition 3 (Construction and Environment Management Plan)
Demolition of the existing side garage and conservatory, the construction of a two storey side extension and single storey rear extension, together with associated internal and external alterations; replacement windows and doors and associated landscaping.
5-day Notice: Cherry Fell (dead) Replacement planting: Prunus sp.
T1, Lime Tree : re-pollard to previous points. T2, Lime Tree : re-pollard to previous points.
Proposed replacement of rear first floor balcony on south elevation; balcony depth to be increased slightly and deck to be raised to allow for level threshold into the apartment
TP1 Holly - Remove. TP2 Conifer - Remove. TP3 Cornus - Crown reduction by 2.5m. TP4 Crab Apple - Crown reduction by 3m. TP5 Amelanchier - Crown reduction by 3m and reshape.
Yew - reduce by less than 1.8m x5 small branches back to centre of hedge line.
T001, 1x Magnolia : reduce the height of the tree by approximately 2.0 m, leaving a final overall height of 8.0m; reduce the radial crown spread by approximately 2.0m, leaving a final radial spread of approximately 8.0m at all compass points; crown thin the overall leaf-bearing twig structure by a maximum of approximately 10%; remove all epicormic growth from throughout the crown; maximum diameter of cut (MDC) 40mm. T002, Magnolia : reduce the height by approximately 2.0m, leaving a final overall height of approximately 6.0m; reduce the radial crown spread by approximately 2.0m, leaving a final radial spread of approximately 3.5m at all compass points; MDC , 40mm.
T1: conifer - dismantle and remove (dead). T4 - Judas Tree: reduce low lateral south eastern limb back to growth point 1.2m from main stem. T5 - Field Maples: crown lift above Quince tree to 4m above ground level, reduce height of Quince at same time by 1m. T9 - Sycamore: reduce southern aspect where overhanging garages by 2-3m, crown lift above garages to achieve a minimum clearance of 1.5m.
T1 - Thuja reduce height of all stems by 4m, maximum diameter cuts(MDC) 80mm. Reduce lateral southern and western spread by 1.5m, MDC 25mm T2 - Pittosporum, reduce northern aspect by approximately 1.5m, maximum diameter of cut 25mm. T3 - Lime, prune back northwestern aspect, away from Magnolia Grandiflora, back to main stem/existing pollard points.
5 day notice: Elm - remove (dead). Exception to Sid Vale Conservation Area. Replacement planting: Elm 'New Horizons'
Certificate of proposed lawful development for conversion of outbuilding to ancillary accommodation
T1 - Western red cedar. Crown reduction of approximately 20% of foliar area. Cut sizes not to exceed 150mm. See annotated photograph. T2 - Silver birch. Reduce crown by approximately 30% of foliar area. Cut sizes not exceeding 50mm. See annotated photograph. T3 - Lawson cypress. Crown thin by approximately 15%. Crown lift to provide appropriate clearance over the adjacent highway - Crown lift to approximately 4m, MDC 50mm.
Demolition of conservatory and construction of two storey extension on the North elevation including two storey garage extension. Raised Patio on West elevation and landscaping works.
Discharge of condition for 25/2030/LBC: Condition 7 (Front Door)
T1, Swamp Cypress : crown reduce by 2.5m in height with Maximum Diameter of Cuts (MDC) of 50mm; Reduce lateral spread of upper canopy by 2m, MDC 75mm.
Discharge of condition for 26/0366/LBC: Condition 11 (Boundary walls), Condition 12 (Paint removal), Condition 13 (Driveway gates)
Erection of 2no electric vehicle chargers
NMA to 25/2336/FUL for the enlargement of the rear window facing the terrace to provide a corner window.
Demolition of existing garage and construction of side extension and car port. Removal of existing chimneys and roof dormer.
Demolition of Conservatory and single storey extension on North East elevation. Construction of Two storey extensions on the North East and South West elevations. Construction of balcony on South east elevation and addition of Solar PV Panels to roof.
Installation of conservation rooflight, alteration to fenestrations and new glass balustrade to first floor balcony.
T1, Oak : whole crown reduction by approximately 1-2m to leave a height of approximately 16m and spread of approximately 11-12m. T2, Willow (dead) : remove to as close to ground level as possible and plant replacement tree close by (species and size still to be decided). T3, Ash : whole crown reduction by approximately 0.5-1m leaving a height of approximately 5m and spread of approximately 2-3m. T4, Maple : prune overhanging branches back to the boundary, sympathetically to keep shape and form.
Discharge of condition for 26/0718/FUL: Condition 3 (Materials), Condition 4 (Drainage), Condition 5 (Ecology), Condition 6 (Trees)
Black Poplar: fell. Reason: safety - it is currently leaning at approximately 23 degrees having previously leant at 20 degrees in 2024. The roots are lifting and it is very likely moving.
T1, Lime : reduce primary northern limb, arising at 3.5m on main stem, by 3m, maximum diameter of cut 75mm; remove hazardous deadwood
T1: Western Red Cedar, multi stemmed dbh 800mm, crown raise to approximately 6m on the north and north western aspect, maximum pruning cuts of no more than 75mm.
Replace 2no. French doors on south elevation
Construction of living room and porch extension
T1, Sycamore: prune all parts of the tree for 90cm below the top of the wall, which are in contact with the wall to give 5cm clearance from the wall as measured from the northern side of the wall to facilitate repairs.
Construction of proposed garage.
10 and 12 Cotford Road: repairs to 2no. chimney stacks and install ventilators on both stacks and new chimney pot on no. 12
Internal alterations on second floor (roof space): Construct new walls to create en-suite; remove part of wall and install new beam over and infill door onto landing area and install fan slate vent on rear (south) elevation
To construct a double garage to the front of the property; to convert the existing single integral garage into a bedroom; to expand the rear facing dormer; to install two additional Velux windows to the south elevation and resurface the driveway
Proposed first floor rear extension, new bay window to front elevation, alterations to fenestration, Construction of porch and re-roofing of the property in Natural Slate.
Certificate of existing lawfulness for the continued use of a barn as ancillary to the host dwelling.
Certificate of proposed lawful development for conversion of existing garage and single storey side/rear extension.
Demolish single story rear extension. Proposed change of use of ground floor shop area to residential use, and the combination with the existing maisonette above to create a single residential building.
Proposed Side Extension. (Phase 1 works only comprising a single storey side extension and associated internal works).