30 Holly Bank Grove York YO24 4EA
Proposal
Single storey front and side extension
- Received
- 7 September 2026
- Council
- City of York Council
- Ward
- Rainworth North And Rufford
- ReceivedReceived7 Sep
- ValidatedValidated7 Sep
- Consult.Consultation
- TargetTarget Date
- DecidedDecided
Have your say
About this application
This is a planning application for a side extension at 30 Holly Bank Grove York YO24 4EA. York has handled 3,821 applications of this type. It has been with the council since 11 August 2026 and is still awaiting a decision. There are no previous applications recorded at this address. We hold 324 applications in total for the YO24 postcode area.
Application details
- Postcode
- YO24 4EA
- Parish
- Rufford
Planning application dates
- Date validated
- 7 September 2026
Planning decision
- Case officer
- Yeung Browne
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
- Article 4 direction: Hmo
Not published by this council, so not checked: tree preservation orders. Ask the council if these matter.
Also checked, none recorded (22)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, Heritage at Risk entries, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Source: York
Track this application
Get email alerts when there is a planning decision or status change.
Get email alerts near YO24
New planning applications delivered to your inbox daily.
Around this site
Nearby applications
- 27 St Georges Place York YO24 1DT25/02103/TCA · TreesApproved0.2 mi
- 19 Pulleyn Drive York YO24 1DY26/00344/NONMAT · AmendmentApproved0.2 mi
- 9 Holly Bank Road York YO24 4DS26/00036/CLU · AmendmentApproved0.2 mi
- Telecommunications Equipment At York Railway Institute Club Hamilton Drive York23/00438/TCNOT · TelecomsApproved0.2 mi
- 6 Robin Grove York YO24 4DR25/00417/CLU · AmendmentAwaiting decision0.3 mi
For applicants and trades
Before the decision
You may need a flood risk assessment. Drainage & flood risk consultants near this site
The site is in flood zone 3 (Environment Agency).
- 0.8 miYorkRTPI
- 24.2 miLeeds
- 30.5 miBedaleRTPI
Nearest first, within 50 miles of the site. Every firm is listed free.
Contractors near this project
Find contractors for extensions near this site- RB Electrical York LTDElectrician0.2 mi
- Zinc Electrical LtdElectricianSolar Panel Installer0.3 mi
- G. P. ElectricalElectrician0.6 mi
- G Munday ElectricalElectrician0.6 mi
Planning something similar?
See what the council approved and refused for single-storey side extensions on your street. Pick your home and get the evidence before you pay for drawings.