Proposal
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary western site access, remove Eastern access and remove drainage requirement for the M5 bridge from S.24/2311/VAR - Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated infrastructure including locks, mooring basin, car parking, cafe and leisure facilities building with combined office and residence for basin manager.
- Received
- 21 January 2026
- Decision level
- Delegated (officer decision)
- Council
- Stroud District Council
- Ward
- Severn Ward
- ReceivedReceived21 Jan
- ValidatedValidated5 Mar
- Consult.Consultation22 Apr
- TargetTarget Date
- DecidedDecided15 Jun
Decided in 102 days (council typically 49)
About this application
This is an application to vary a condition at Stroudwater Canal Phase 1B Eastington Gloucestershire. Stroud has handled 666 applications of this type. This one was decided in 145 days, 14 weeks longer than Stroud's typical decision time. The site is in the Stroud Industrial Heritage conservation area. There have been 27 other applications at this address. In the past year there have been 101 applications across Severn Ward.
92% of conditions applications at Stroud District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).
Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street
Application details
- Application type
- Variation of Condition
- Scale / size
- Small
- Parish
- Eastington Parish Council
Planning application dates
- Date validated
- 5 March 2026
- Consultation expiry
- 22 April 2026
- Consultation end
- 22 April 2026
Applicant and agent
- Agent address
- Cotswold Canals Connected
Additional information
- Documents
- 12
Site constraints
Designations that overlap or adjoin the site outline.
- Flood zone 3: High probability (rivers and sea)Part of the site
- Heritage at Risk Register: Stroud Industrial Heritage (IHCA), Multiple parishes within Stroud DistrictPart of the site
Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.
Possibly incomplete for this council: tree preservation orders.
Also checked, none recorded (21)
flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.
A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.
Data © Crown copyright and others · sources and licences
Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.
© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.
© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.
© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.
Contains Ordnance Survey data © Crown copyright and database right 2026.
Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.
Associated applications
- 202621 Jan
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR
ApprovedDischarge of conditionsS.26/0130/DISCON - 202621 Jan
Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary…
This applicationApprovedVariation of conditions (s73)S.26/0143/VAR - 202614 Jan
Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR
ApprovedDischarge of conditionsS.26/0081/DISCON - 202418 Dec
Variation of condition 32 to remove Phase 2 Oldbury Aqueduct from requiring flood mitigation from…
ApprovedVariation of conditions (s73)Part ofS.24/2311/VAR
Planning history at this site
20 other applications at this property, newest first.
- 202515 Dec
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/2466/DISCON - 20252 Dec
Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and…
ApprovedDischarge of conditionsS.25/2313/DISCON - 202531 Oct
Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack…
ApprovedTrees in a Conservation AreaS.25/2109/TCA - 202524 Oct
Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 1a from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/2078/DISCON - 20252 Apr
Discharge of condition 39 (Construction Heritage Management Plan) for Phase 3 from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/0688/DISCON - 202528 Feb
Discharge of condition 43 (construction hours) for Phase 10 from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/0430/DISCON - 202510 Feb
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.24/1595/VAR
PendingDischarge of conditionsS.25/0252/DISCON - 20256 Feb
Discharge of condition 12 (CEMP) for Phase 1c from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/0231/DISCON - 20255 Feb
Discharge of condition 12 (CEMP) for Phase 10 from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/0235/DISCON - 20255 Feb
Discharge of condition 30 (CMP) for Phase 10 from S.24/1595/VAR
ApprovedDischarge of conditionsS.25/0233/DISCON - 202425 Oct
Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application…
ApprovedDischarge of conditionsS.24/1947/DISCON - 202423 Oct
Discharge of condition 11 (ecology mitigation) from S.19/0291/FUL
ApprovedDischarge of conditionsS.24/1925/DISCON - 202418 Oct
Discharge of condition 32 (flood mitigation) from S.19/0291/FUL
WithdrawnDischarge of conditionsS.24/1889/DISCON - 202427 Aug
Removal of Conditions 24 & 25 (TTRO Required) from permitted application S.19/0291/FUL
ApprovedVariation of conditions (s73)S.24/1595/VAR - 202418 Jul
Discharge of condition 41 (ground contamination) from S.19/0291/FUL
ApprovedDischarge of conditionsS.24/1329/DISCON - 202412 Jul
Discharge of condition 30 (construction management plan) for phase 1a - A419 temporary Junction (West of M5)…
ApprovedDischarge of conditionsS.24/1274/DISCON - 202428 Jun
Discharge of condition 43 (construction hours) for Phase 2 from S.19/0291/FUL
ApprovedDischarge of conditionsS.24/1210/DISCON - 202428 Jun
Discharge of condition 14 (construction surface water management plan) for Phase 2 from application…
ApprovedDischarge of conditionsS.24/1212/DISCON - 202419 Jun
Discharge of condition 30 (construction management plan) for Phase 2 from S.19/0291/FUL
ApprovedDischarge of conditionsS.24/1129/DISCON - 202414 Jun
Discharge of condition 20 (M5 boundary treatment) for Phases 10 and 11 from the application S.24/1595/VAR
ApprovedDischarge of conditionsS.24/1105/DISCON
Source: Stroud
Track this application
Get email alerts when there is a planning decision or status change.
Around this site
Nearby applications
- Stroudwater Canal Phase 1B Eastington GloucestershireS.25/2078/DISCON · ConditionsApproved0.0 mi
- Stroudwater Canal Phase 1B Eastington GloucestershireS.26/0130/DISCON · ConditionsApproved0.0 mi
- Stroudwater Canal Phase 1B Eastington GloucestershireS.25/0430/DISCON · ConditionsApproved0.0 mi
- Stroudwater Canal Phase 1B Eastington GloucestershireS.25/0252/DISCON · ConditionsAwaiting decision0.0 mi
- Stroudwater Canal Phase 1B Eastington GloucestershireS.25/2313/DISCON · ConditionsApproved0.0 mi
For applicants and trades
Contractors near this project
- Beacon Electrical LtdElectrician0.5 mi
- Electrical & Alarm ServicesElectrician0.7 mi
- Platinum ElectricalElectrician0.8 mi
- R & B Electrical Installations LtdElectrician0.8 mi
Planning something similar?
See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.