Stroudwater Canal Phase 1B Eastington Gloucestershire

S.24/1889/DISCONDischarge of ConditionWithdrawn
Discharge / amendments

Withdrawn on 5 December 2024

Delegated (officer decision)

Proposal

Discharge of condition 32 (flood mitigation) from S.19/0291/FUL. (Site wide).

Received
18 October 2024
Decision level
Delegated (officer decision)
Ward
Severn Ward
  1. Received18 Oct
  2. Validated1 Nov
  3. Consult.27 Nov
  4. Target
  5. Decided5 Dec

Decided in 34 days (council typically 49)

About this application

This is an application to discharge conditions at Stroudwater Canal Phase 1B Eastington Gloucestershire. Stroud has handled 666 applications of this type. It was withdrawn 48 days after it was submitted, before a decision was made. The site is in the Stroud Industrial Heritage conservation area. There have been 27 other applications at this address. In the past year there have been 101 applications across Severn Ward.

92% of conditions applications at Stroud District Council were approved. Across all application types, the council typically decides in about 7 weeks (median).

Based on decided applications received in the last 3 years.Planning something similar? See what gets approved on your street

Application details

Application type
Discharge of Condition
Scale / size
Small
Parish
Eastington Parish Council

Planning application dates

Date validated
1 November 2024
Consultation expiry
27 November 2024
Consultation end
27 November 2024

Additional information

Documents
6

Site constraints

Checking the site
2/3
Council recordsAppealsFlood risk

Designations at the address point. Ones next to the site may also apply.

Not published by this council, so not checked: Article 4 directions. Ask the council if these matter.

Possibly incomplete for this council: tree preservation orders.

Also checked, none recorded (21)

flood storage areas, conservation areas, listed buildings, green belt, scheduled monuments, World Heritage Sites, World Heritage Site buffer zones, registered parks and gardens, registered battlefields, nutrient neutrality catchments, national parks, National Landscapes, SSSIs, Special Areas of Conservation, Special Protection Areas, Ramsar sites, ancient woodland, national nature reserves, local nature reserves, heritage coasts and brownfield registers.

A guide only, from official open data; it is not a planning search. Flood zones cover rivers and sea, not surface water.

Data © Crown copyright and others · sources and licences

Contains public sector information from planning.data.gov.uk (MHCLG and local planning authorities), licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.

© Historic England 2026. Contains Ordnance Survey data © Crown copyright and database right 2026. The Historic England GIS Data contained in this material was obtained on 2026-11-03. The most publicly available up to date Historic England GIS Data can be obtained from HistoricEngland.org.uk.

© Natural England copyright. Contains Ordnance Survey data © Crown copyright and database right 2026.

© Environment Agency copyright and/or database right 2026. All rights reserved. Flood Map for Planning, Open Government Licence v3.0.

Contains Ordnance Survey data © Crown copyright and database right 2026.

Source: Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right 2026.

Associated applications

  1. 2024
    18 Dec

    Variation of condition 32 to remove Phase 2 Oldbury Aqueduct from requiring flood mitigation from…

    ApprovedVariation of conditions (s73)S.24/2311/VAR
  2. 2024
    25 Oct

    Discharge of condition 43 (construction hours) for Phases 1a, 1c, 3 and 11 only from the application…

    ApprovedDischarge of conditionsS.24/1947/DISCON
  3. 2024
    23 Oct

    Discharge of condition 11 (ecology mitigation) from S.19/0291/FUL

    ApprovedDischarge of conditionsS.24/1925/DISCON
  4. 2024
    18 Oct

    Discharge of condition 32 (flood mitigation) from S.19/0291/FUL

    This applicationWithdrawnDischarge of conditionsS.24/1889/DISCON
  5. 2024
    27 Aug

    Removal of Conditions 24 & 25 (TTRO Required) from permitted application S.19/0291/FUL

    ApprovedVariation of conditions (s73)S.24/1595/VAR
  6. 2024
    18 Jul

    Discharge of condition 41 (ground contamination) from S.19/0291/FUL

    ApprovedDischarge of conditionsS.24/1329/DISCON
  7. 2024
    12 Jul

    Discharge of condition 30 (construction management plan) for phase 1a - A419 temporary Junction (West of M5)…

    ApprovedDischarge of conditionsS.24/1274/DISCON
  8. 2024
    28 Jun

    Discharge of condition 43 (construction hours) for Phase 2 from S.19/0291/FUL

    ApprovedDischarge of conditionsS.24/1210/DISCON
  9. 2024
    28 Jun

    Discharge of condition 14 (construction surface water management plan) for Phase 2 from application…

    ApprovedDischarge of conditionsS.24/1212/DISCON
  10. 2024
    19 Jun

    Discharge of condition 30 (construction management plan) for Phase 2 from S.19/0291/FUL

    ApprovedDischarge of conditionsS.24/1129/DISCON
  11. 2024
    13 Jun

    Discharge of condition 3 (phasing strategy) from S.19/0291/FUL

    ApprovedDischarge of conditionsS.24/1108/DISCON
  12. 2019
    8 Feb

    Reinstatement of the 'Missing Mile' section of the Stroudwater Navigation and development of associated…

    ApprovedFull Planning ApplicationPart ofS.19/0291/FUL

Planning history at this site

16 other applications at this property, newest first.

  1. 2026
    21 Jan

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phase 10 from S.24/2311/VAR

    ApprovedDischarge of conditionsS.26/0130/DISCON
  2. 2026
    21 Jan

    Variation of conditions 21 and 22 to remove drainage requirement for the M5 bridge and amend temporary…

    ApprovedVariation of conditions (s73)S.26/0143/VAR
  3. 2026
    14 Jan

    Discharge of condition 19 (M5 detailed design) for Phase 10 from S.24/2311/VAR

    ApprovedDischarge of conditionsS.26/0081/DISCON
  4. 2025
    15 Dec

    Discharge of condition 32 (flood mitigation) from S.24/1595/VAR

    ApprovedDischarge of conditionsS.25/2466/DISCON
  5. 2025
    2 Dec

    Discharge of condition 14 (Construction Surface Water Management Plan) for Phases 1c, 3, 4a, 4b, 5, 7, 8 and…

    ApprovedDischarge of conditionsS.25/2313/DISCON
  6. 2025
    31 Oct

    Trees to be felled: T1 - 2 x 15m crack willow & 1 x 12m crack willow - bramble scrub. T2 - 2 x 12m crack…

    ApprovedTrees in a Conservation AreaS.25/2109/TCA

Source: Stroud

Track this application

Get email alerts when there is a planning decision or status change.

Around this site

For applicants and trades

Planning something similar?

See what the council approved and refused on your street for the project you have in mind. Pick your home and get the evidence before you pay for drawings.