Decision madeSolar farm· EN010101

Little Crow Solar Park

A nationally significant infrastructure project in North Lincs. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 226 hectares inside the published boundary.

What is proposed

Energy scheme comprising ground mounted solar photovoltaic arrays, electrical storage, grid connection infrastructure and other infrastructure integral to its construction, operation, maintenance and decommissioning. The solar park will have an intended design capacity of over 50MWp (megawatts peak).