Kingsway Solar Farm
A nationally significant infrastructure project in Cambridge, Cambridgeshire, East Cambridgeshire, South Cambridgeshire. The promoter is consulting and preparing its application.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 6,106 hectares inside the published boundary.
What is proposed
Kingsway Solar Farm will comprise the construction, operation, maintenance and decommissioning of a solar photovoltaic (PV) and electrical battery storage generating facility with a generation capacity of up to 500MW. This will include the associated development and infrastructure required to facilitate a connection to the National Grid.
Linked planning applications
Council consultations, related applications and requirement sign-offs that quote this project.
- EN010165 · NSIP England · 21 May 2026
Kingsway Solar Farm
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.