Skip to content
Decision madeWaste water treatment plants· WW010003

Cambridge Waste Water Treatment Plant Relocation

A nationally significant infrastructure project in Cambridge, South Cambridgeshire, Cambridgeshire. A decision has been made. We are confirming the outcome.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 211 hectares inside the published boundary.

What is proposed

Construction and operation of an Integrated Waste Water Treatment Centre and Sludge Treatment Plant, transfer tunnels, terminal and intermediate pumping stations, vehicle access, utilities connections, renewable energy generation, ancillary buildings and landscaping.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.