Skip to content
Pre-applicationElectricity lines· EN0210004

Hinkley Point C Connection Project Material Change

A nationally significant infrastructure project in Bristol, North Somerset, Sedgemoor, Somerset, South Gloucestershire, West Somerset. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decision made

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 1,039 hectares inside the published boundary.

What is proposed

The proposed Hinkley Point C Connection Material Change application seeks consent for permanent access infrastructure for the purpose of maintenance and operation of the Project. This includes amendments to the authorised works, powers and land rights set out in the Development Consent Order.

Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.