Pre-applicationSolar farm· EN010171
Future Energy Llanwern Solar Project
A nationally significant infrastructure project in Newport, Monmouthshire. The promoter is consulting and preparing its application.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 554 hectares inside the published boundary.
What is proposed
The development proposal relates to the construction, operation, maintenance and decommissioning of Future Energy Llanwern, a ground mounted solar farm with a generating capacity of over 350 MW for a temporary period of 40 years.
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.