Pre-applicationElectricity lines· EN0210010

Eastern Green Link 5

A nationally significant infrastructure project in East Lindsey, Lincolnshire. The promoter is consulting and preparing its application.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 87,564 hectares inside the published boundary.

What is proposed

The key onshore and offshore elements of the Project include: - Offshore high voltage direct current (HVDC) cable. In English waters the cable would be approximately 415 km long (In English and Scottish waters the total cable length would be up to 555 km) - A transition joint bay (TJB) which will enable the connection of the offshore and onshore HVDC underground cables, located onshore and underground near to the proposed cable landfall at Anderby Creek on the Lincolnshire coastline - Underground HVDC cable running approximately 9 km from the proposed landfall at Anderby Creek on the Lincolnshire coastline to a converter station in East Lindsey - One converter station only, located either to the north-east of Bilsby or north-west of Hutton, both in East Lindsey, Lincolnshire - Underground high voltage alternating current (HVAC) cable running up to 3 km to connect the proposed converter station to the proposed Lincolnshire Connection Substation (LCS) (note: the LCS is being proposed as part of NGET’s proposed Grimsby to Walpole Project, which is a separate project, currently being developed).