Pre-applicationOffshore wind· EN010144
Dogger Bank D Wind Farm
A nationally significant infrastructure project in East Riding. The promoter is consulting and preparing its application.
Free. We'll email you when it moves stage: consultation, submission, examination and decision.
Where it is in the process
- Pre-application
- Submitted
- Pre-examination
- Examination
- Recommendation
- Decision due
- Decided
The site
The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 710,339 hectares inside the published boundary.
What is proposed
Dogger Bank D (DBD) Offshore Wind Farm encompasses a circa 2000MW offshore wind farm, offshore high voltage transmission and potential onshore transmission and Hydrogen Production Facility infrastructure
Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright and database right 2026.