DecidedOffshore wind· EN010125

Dogger Bank South Offshore Wind Farms

A nationally significant infrastructure project in East Riding. A decision has been made.

Free. We'll email you when it moves stage: consultation, submission, examination and decision.

Where it is in the process

  1. Pre-application
  2. Submitted
  3. Pre-examination
  4. Examination
  5. Recommendation
  6. Decision due
  7. Decided

The site

The outline is the boundary the promoter published. It can include cable, pipeline or road routes as well as the main site. 139,289 hectares inside the published boundary.

What is proposed

The Dogger Bank South Offshore Wind Farms project comprises the two offshore wind farms (Dogger Bank South West and Dogger Bank South East), and associated offshore and onshore infrastructure including offshore and onshore high voltage electricity cables, onshore and offshore electricity substation(s), connection(s) to the National Grid and ancillary and temporary works

Linked planning applications

Council consultations, related applications and requirement sign-offs that quote this project.

  • 26/02091/NSREQ · East Riding · 6 August 2026

    Discharge of Requirements 10 (Provision of landscaping - Phase A), 16 (Pre-commencement, Construction and Operational Drainage Strategy - Phase A & B), 17 (Foul Water Drainage - Phase A & B), 19 (Code of Construction Practice - Phase A & B), 32 (Biodiversity Net Gain - Phase A & B) & 33 (Onshore Mon

  • 26/01936/NSREQ · East Riding · 23 July 2026

    Discharge of Requirement 14 (Phase A - Traffic and Transport) and 26 (All Phases - Skills and Employment) of DCO granted by SoS for Dogger Bank South offshore wind farm and onshore works - Planning Inspectorates ref: EN010125

  • 26/01871/NSREQ · East Riding · 16 July 2026

    Discharge of Requirements 15 (Highway Access Plan - Phase A), 18 (Written Scheme of Investigation - Phases A & B), 24 (Public Rights of Way Management Plan - Phase A) and 36 (Permanent Access Road Design - Phase A) for Phase A works (Enabling Works, Permanent Access Road, Compounds) and Phase B work

  • 26/01821/NSREQ · East Riding · 16 July 2026

    Discharge of Requirement 18 (Written Scheme of Investigation) for Phase C at the Onshore Substation Zone of DCO granted by SoS for Dogger Bank South offshore wind farm and onshore works - Planning Inspectorates ref: EN010125

  • 26/30339/NSREQ · East Riding · 30 June 2026

    Discharge of Requirements 8 (1) and (2) (All Phases of authorised development), 12 (1) to (4) (Pre-commencement and Phase A & B - Ecological management plan), 15 (1) to (3) (Pre-commencement - Highway accesses) and 19 (4) (Pre-commencement - Screening and Fencing Works (Code of construction practice