Search Westwood (EX6) planning applications
140 applications on record · within 1 km of the centre of Westwood (EX6) · updated daily · Teignbridge District Council
Only 1 application in the last 90 days, so this shows every one we hold.
- The Old Vicarage 22 Cofton Hill Cockwood Devon EX6 8RBAwaiting decisionT1 Monterey Pine - Remove limb with hazard fracture at 14m to the East. Remove major deadwood.Received 19 Oct 202626/01623/TPO
- Cedilla Church Road Cockwood Devon EX6 8NUApprovedRetention of replacement external staircase and elevated access walkway (retrospective)Householder applicationsReceived 10 Mar 202626/00402/HOU
- Higher Cofford Kenton Devon EX6 8RSApprovedSlurry lagoon for collecting and storing animal waste and milking parlour washingsAgricultural NotificationReceived 22 Jan 2026Decided 13 Feb 202626/00104/AGR
- Land At Middlewood NGR 297323 80597 Middlewood CockwoodAwaiting decisionDischarge of conditions 3(Surface Water/Drainage), 4(Meter Boxes) and 5(External Materials) on planning permission 23/01217/FUL for DwellingDischarge of Conditions 1Received 21 Nov 202523/01217/COND1
- Cofton Country Holiday Park Cofton Lane Cofton Starcross Devon EX6 8RPAwaiting decisionFirst floor roof conversion and new first floor extension over flat roof areas to be used for on-site office accommodation, together with external staircase, AC units, new plant room and covered walkwayFull Planning ApplicationReceived 31 Oct 202525/01784/FUL
Planning in Westwood (EX6)
- Approved
- 62%
- 8 of 13 decided
- Decision time
- about 7 weeks
- on average
Applications within 1 km of the centre of Westwood (EX6) in the last 24 months, from Teignbridge District Council's planning register.
Decided by Teignbridge District CouncilCouncil page
Around Westwood (EX6)
Postcode districts
EX6 191 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Teignbridge District Council
For home projects and trades
- Architects in WestwoodFor planning applications, extensions and new builds.
- Building contractors in WestwoodLocal builders for approved plans and permitted development.
Builders and trades: get new Westwood jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Westwood (EX6)
Westwood is a settlement located in Devon, England.
Property prices in Westwood show an average sale price of £342,345, based on 50 recent transactions recorded by HM Land Registry. There are currently no active flood warnings for the Westwood area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Westwood a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Westwood planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.
To comment on or object to a planning application near Westwood, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 16 planning applications were submitted near Westwood. Of these, 62% were approved, with an average decision time of 48 days.
The most common types were full planning applications (3), outline applications (3), discharge of conditions (2).
2 planning appeals were lodged, of which 0 were allowed and 2 were dismissed (0% success rate).