Search West Vale planning applications
25 applications received or decided in the last 12 months · within 1 km of the centre of West Vale · updated daily · Calderdale Metropolitan Borough Council
Only 2 applications in the last 90 days, so this shows the last 12 months.
- Salterhebble Top Lock 27 Wakefield Road Copley Halifax CalderdaleAwaiting decisionReplace the existing open wire conductors in favour a Aerial Bunched ConductorReceived 4 Nov 202626/90034/ELC
- 88 Hoults Lane Greetland Elland Calderdale HX4 8HNAwaiting decisionFront, side and rear single-storey extension. Detached garden room in rear garden.Received 14 Sep 202626/00752/HSE
- Sports Ground Stainland Road Elland Calderdale HX4 8LSAwaiting decisionInstallation of lighting columns along with low energy LED floodlighting.Received 10 Aug 202626/00442/FUL
- 54 High Meadows Greetland Elland Calderdale HX4 8QFAwaiting decisionReplace existing wooden cantilever balcony (0.9 metre x 3.5 metre), with a larger steel support 4 metre x 2 metre balcony.Received 28 Jul 202626/00594/HSE
- Laurel Cottage 26 Rochdale Road Greetland Elland Calderdale HX4 8ALAwaiting decisionRepair and repointing of existing masonry (Listed Building Consent)Received 10 Jul 202626/00464/LBC
Planning in West Vale
- Approved
- 87%
- 13 of 14 decided
- Decision time
- about 12 weeks
- on average
Applications within 1 km of the centre of West Vale in the last 24 months, from Calderdale Metropolitan Borough Council's planning register.
Decided by Calderdale Metropolitan Borough CouncilCouncil page
Around West Vale
Postcode districts
HX4 84 applications in the last 12 monthsHX3 236 applications in the last 12 monthsHX5 40 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Calderdale Metropolitan Borough Council
For home projects and trades
- Architects in West ValeFor planning applications, extensions and new builds.
- Building contractors in West ValeLocal builders for approved plans and permitted development.
Builders and trades: get new West Vale jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About West Vale
West Vale is a village located in Calderdale, West Yorkshire, within the Greetland and Stainland parish under the Calderdale Council. Situated just 2.5 miles south of Halifax, 2 miles west of Elland, and 4 miles north-west of Huddersfield, it offers a strategic position for potential planning applications and developments in the region.
There are currently no active flood warnings for the West Vale area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes West Vale a particularly low-crime area, which is often reflected in its desirability and property values.
The area around West Vale has 3 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, West Vale planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near West Vale, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 33 planning applications were submitted near West Vale. Of these, 87% were approved, with an average decision time of 86 days.
The most common types were full planning applications (3), outline applications (2), tree works (1). 1 large-scale development was submitted during this period.
3 planning appeals were lodged, of which 0 were allowed and 3 were dismissed (0% success rate).