Search West Allotment planning applications
20 applications received or decided in the last 12 months · within 1 km of the centre of West Allotment · updated daily · North Tyneside Metropolitan Borough Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- Costa Coffee Drive Thru Northumberland Park Way Backworth Newcastle Upon Tyne NE27 0FSAwaiting decisionSiting an InPost Parcel LockerReceived 2 Oct 202626/01368/FUL
- 12 Rowchester Way Holystone Newcastle Upon Tyne NE27 0JAAwaiting decisionLoft conversion involving an increased roof pitch and 1no. dormer windows to front and 2no. to rear. Erection of a second-storey extension over the front garage, including a flat roof area over. Installation of a new side window to the stair lobby with a rooflight window above. Shortening of the front porch canopy. Cladding to the front gableReceived 28 Sep 202626/01350/FULH
- Quadrant East 16 The Silverlink North Cobalt Business Park West Allotment Newcastle Upon Tyne NE27 0BYAwaiting decisionInstallation of rooftop air source heat pumps, thermal storage vessels, associated plant, pipework, support structures, access infrastructure and roof access door in connection with the decarbonisation of the existing office buildingReceived 18 Sep 202626/01290/FUL
- 8 Miller Close Palmersville Newcastle Upon Tyne NE12 9ERAwaiting decisionFront part extension and small side infil to the rearReceived 8 Sep 202626/01269/FULH
- 35 Rowchester Way Holystone Newcastle Upon Tyne NE27 0JAApprovedErection of a single-storey rear kitchen extensionReceived 13 Aug 2026Decided 1 Oct 202626/01157/CLPROP
Planning in West Allotment
- Approved
- 94%
- 15 of 16 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of West Allotment in the last 24 months, from North Tyneside Metropolitan Borough Council's planning register.
Decided by North Tyneside Metropolitan Borough CouncilCouncil page
Around West Allotment
Postcode districts
NE27 39 applications in the last 12 monthsNE12 147 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: North Tyneside Metropolitan Borough Council
For home projects and trades
- Architects in West AllotmentFor planning applications, extensions and new builds.
- Building contractors in West AllotmentLocal builders for approved plans and permitted development.
Builders and trades: get new West Allotment jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About West Allotment
West Allotment is a village situated in the Metropolitan Borough of North Tyneside, formerly part of Northumberland until 1974. Located about 4 miles inland from Whitley Bay and 3 miles north of The Tyne Tunnel, it serves as a transitional zone between urban development and the green belt that extends into southeast Northumberland. This unique positioning may influence planning applications, catering to both residential needs and conservation efforts in the surrounding areas.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes West Allotment a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, West Allotment planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near West Allotment, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 39 planning applications were submitted near West Allotment. Of these, 94% were approved, with an average decision time of 60 days.
The most common types were full planning applications (8), outline applications (3), discharge of conditions (2). 2 large-scale developments were submitted during this period.