Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Week (TQ9), Devon Planning Applications

Recent planning applications near Week (TQ9), Devon.

Devon · England · settlement

Planning applications in Week (TQ9) are administered by Devon County Council. View the full Devon County Council planning applications page for approval rates and decision timelines.

About Week (TQ9)

Week is a hamlet located within the civil parish of Chulmleigh, in North Devon, England. Situated about 3.6 miles (5.8 km) south-west of the nearest town, Chulmleigh, this quaint settlement may be of interest to those researching planning applications in the region.

District: Chulmleigh

Enter a postcode to search for planning applications near Week (TQ9).

Town Insights

Property Prices

Average property sale price: £377,220 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: South Hams
  • Parliamentary constituency: South Devon
  • LSOA: South Hams 002B

Crime Statistics

0 crimes reported in 2026-05.

Flood Risk

No active flood warnings near Week (TQ9).

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Week (TQ9).

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Week (TQ9) based on the last 24 months of planning data.

Nearby Applications

9 planning applications found near Week (TQ9).

  1. - 13 Broom Park Dartington TQ9 6JR
    Certificate of lawfulness for existing extension & porch
    Status: Undecided | Type: Amendment | Council: South West Devon | Date: 2026-06-12
    View full details
  2. - Redwood River School Old Postern Dartington Hall TQ9 6EA
    TPO 1126; T1-T7: Yew – crown height reduction to 5m from ground level on the higher side of the drive, crown height reduction on trees on lower side of drive so all trees have the same height, install
    Status: Undecided | Type: Trees | Council: South West Devon | Date: 2026-05-01
    View full details
  3. - Swimming Pool Shinners Bridge Dartington TQ9 6JD
    The siting of a temporary mobile sauna unit with ancillary amenity and office structures (retrospective)
    Status: Undecided | Type: Full | Council: South West Devon | Date: 2026-02-23
    View full details
  4. - Old Postern Dartington Hall TQ9 6EA
    Certificate of lawfulness for works to listed building proposed existing internal timber cruck frame and associated architrave repairs.
    Status: Undecided | Type: Heritage | Council: South West Devon | Date: 2026-02-09
    View full details
  5. - Redwood River School Old Postern Dartington Hall TQ9 6EA
    T1956 - Monterey pine - Sectional dismantle and complete removal of the existing tree. We propose to remove the mature Monterey pine located at the entrance to the school. The works will be carried ou
    Status: Permitted | Type: Trees | Council: South West Devon | Date: 2026-02-02
    View full details
  6. - 1 Maplefield Close Dartington TQ9 6TN
    Application to determine if prior approval is required for proposed single storey conservatory to rear of property extending 6.0m beyond original rear wall, with a maximum height of 3.8m and eaves hei
    Status: Permitted | Type: Outline | Council: South West Devon | Date: 2025-12-24
    View full details
  7. - Land At Sx 782 623, Symonds Drive, Dartington
    Application for the erection of a single residential dwelling(Affordable Discount Market)
    Status: Conditions | Type: Full | Council: South West Devon | Date: 2023-11-02
    View full details
  8. - Land at Broom Park, Dartington, TQ9 6JR
    Application for approval of details reserved by condition 3 (Stonefaced hedgebank) of planning consent 4442/21/ARM)
    Status: Conditions | Type: Conditions | Council: South West Devon | Date: 2023-09-06
    View full details
  9. - Land at Broom Park, Dartington, TQ9 6JR
    Non Material Minor amendment to planning consent 4442/21/ARM forchanges to windows & door positions on plot 77(House Type 5B HTW) &plot 79 (House Type 5B HTX)
    Status: Conditions | Type: Amendment | Council: South West Devon | Date: 2023-06-13
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Week (TQ9) in Devon

Week is a hamlet located within the civil parish of Chulmleigh, in North Devon, England. Situated about 3.6 miles (5.8 km) south-west of the nearest town, Chulmleigh, this quaint settlement may be of interest to those researching planning applications in the region. It sits within the Chulmleigh district.

Property prices in Week (TQ9) show an average sale price of £377,220, based on 50 recent transactions recorded by HM Land Registry.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Week (TQ9) a particularly low-crime area.

Week (TQ9) has one conservation area within its boundaries: No data available for publication by HE. Planning applications within or near this conservation area are subject to additional scrutiny to preserve the architectural and historic character of the area. Homeowners and developers should be aware that permitted development rights may be restricted.

Ecology & Nature Designations

The area around Week (TQ9) includes 5 Ancient Woodland sites. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.

For anyone interested in property development or monitoring local planning decisions, Week (TQ9) planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Week (TQ9)

In the last 24 months, 17 planning applications were submitted near Week (TQ9). Of these, 86% were approved, with an average decision time of 65 days.

This is broadly in line with the national average of approximately 87%. Week (TQ9) maintains a standard approach to planning decisions.

At 65 days on average, decisions near Week (TQ9) slightly exceed the 8-week statutory target for minor applications, though this is common across many councils.

The most common application types near Week (TQ9) were full planning applications (4), outline applications (4), other applications (3). Full planning applications account for 24% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

Nearby Towns

Explore planning applications in nearby areas:

  • Shinner's Bridge planning applications
  • Dartington planning applications
  • Puddaven planning applications
  • Cott planning applications
  • Longcause planning applications
  • Swallowfields planning applications
  • Staverton planning applications
  • Totnes planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account