Search Ure Bank planning applications
45 applications received or decided in the last 12 months · within 1 km of the centre of Ure Bank · updated daily · North Yorkshire Council
Only 8 applications in the last 90 days, so this shows the last 12 months.
- Beechfield Magdalens Road Ripon North Yorkshire HG4 1HUAwaiting decisionFell 1 no. Ash tree (T1) to a height of 1.5 metres within Ripon Conservation Area.Received 21 Oct 202626/06679/TCON
- Little Studley Road Ripon North Yorkshire HG4 1HDAwaiting decisionErection of 1 no. self build dwelling, with associated access areas, landscaping and works.Received 15 Oct 202626/05808/FUL
- Old Goods Yard Hutton Bank Ripon North Yorkshire HG4 5DTAwaiting decisionApproval of details under Condition 11 remediation strategy for plots 1,2 & 6-12 and condition 13b written evidence to demonstrate specified noise levels arosss the whole residential site of Section 73 outline permission ZC23/02248/DVCMAJ for 37 dwellings (details of access and layout considered) and serviced employment plotsDischarge of ConditionsReceived 9 Oct 202626/06677/DISCON
- Hillcrest Little Studley Road Ripon North Yorkshire HG4 1HDApprovedCrown Reduction (by 1 metre in height & to 2.5 metres radiual spread) of 1 no Yew (T4) within Tree Preservation Order 16/2003 (T1 on map submitted)Protected Tree Works applicationReceived 24 Aug 2026Decided 19 Oct 202626/05201/TPO
- Squirrel Lodge Little Studley Road Ripon North Yorkshire HG4 1HDAwaiting decisionCrown Lift (to 5.1 meters) 1 no Sycamore (T2) Crown Lift (to 4.1 meters) and dead wood 1 no Sycamore and 3 no Beech (T3-T6) within Tree Preservation order 28/1996.Received 21 Aug 202626/04552/TPO
Planning in Ure Bank
- Approved
- 88%
- 64 of 71 decided
- Decision time
- about 8 weeks
- on average
Applications within 1 km of the centre of Ure Bank in the last 24 months, from North Yorkshire Council's planning register.
Decided by North Yorkshire CouncilCouncil page
Around Ure Bank
Postcode districts
HG4 251 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: North Yorkshire Council
For home projects and trades
- Architects in Ure BankFor planning applications, extensions and new builds.
- Building contractors in Ure BankLocal builders for approved plans and permitted development.
Builders and trades: get new Ure Bank jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Ure Bank
Ure Bank is a suburb of Ripon in North Yorkshire, situated just 1 mile (1.6 km) north of the city centre across the River Ure. Originally developed as a small settlement in the 19th century, it became part of Ripon in the early 20th century. The area has historical significance, having once hosted an army camp and the city's railway station, making it a notable location for planning applications related to residential and commercial development.
There are currently no active flood warnings for the Ure Bank area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Ure Bank a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Ure Bank has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Ure Bank planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Ure Bank, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 92 planning applications were submitted near Ure Bank. Of these, 88% were approved, with an average decision time of 57 days.
The most common types were tree works (44), full planning applications (16), discharge of conditions (13). 4 large-scale developments were submitted during this period.