Search Upton planning applications
28 applications received or decided in the last 12 months · within 1 km of the centre of Upton · updated daily · West Northamptonshire Council
Only 3 applications in the last 90 days, so this shows the last 12 months.
- 1 Willow Close Northampton NN5 4GLAwaiting decisionG1 Lime trees - Crown raise trees to 3m/first union, remove epicormic growthWorks to Trees (Preservation Order)Received 21 Sep 20262026/4050/TPO
- 102 Ashby Wood Drive Northampton NN5 4DXApprovedInstallation of 1 roof light to rear roof slope (retrospective)Full Planning PermissionReceived 23 Mar 2026Decided 26 Jun 20262026/1498/FULL
- St Crispin Social Club Berrywood Road Northampton NN5 4XDApprovedWorks to x13 lime trees within a conservation areaWorks to Trees (Conservation Area)Received 9 Mar 2026Decided 20 Apr 20262026/1055/TCA
- 201 St Crispin Drive Northampton NN5 4ULApproved2 x Cherry tree to be removed on customers request for more light and T1 causing significant damage to surrounding footpath and its close proximity to the road.Works to Trees (Conservation Area)Received 10 Feb 2026Decided 23 Mar 20262026/0654/TCA
- 9 Holmleigh Close Northampton NN5 6JEApprovedTree Species: Conifer trees (T1 – T14 all closely positioned together) and a small mixed species hedge (H1) Works Requirement: Removal Reasons for removal: Overgrown to size too large for the location. A suitable reduction is not applicable and the trees are now encroaching into the gardens as well as neighbouring driveways posing a damage risk. The client is also looking to create an access fence in the area.Works to Trees (Conservation Area)Received 21 Jan 2026Decided 27 Feb 20262026/0318/TCA
Planning in Upton
- Approved
- 96%
- 48 of 50 decided
- Decision time
- about 15 weeks
- on average
Applications within 1 km of the centre of Upton in the last 24 months, from West Northamptonshire Council's planning register.
Decided by West Northamptonshire CouncilCouncil page
Around Upton
Postcode districts
NN5 105 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: West Northamptonshire Council
For home projects and trades
- Architects in UptonFor planning applications, extensions and new builds.
- Building contractors in UptonLocal builders for approved plans and permitted development.
Builders and trades: get new Upton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Upton
Upton, a civil parish in Northamptonshire, is located approximately 3.5 miles west of Northampton town centre along the A4500 road. Once a scattered hamlet, Upton has transformed into a key area of town expansion, reflecting the growing development in the region. Its proximity to Northampton makes it a significant location for planning applications and future developments. The settlement has a population of approximately 10,028 (2021 estimate). It sits within the West Northamptonshire district.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Upton a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Upton has 1 nature designation nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Upton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Upton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 55 planning applications were submitted near Upton. Of these, 96% were approved, with an average decision time of 104 days.
The most common types were full planning applications (24), tree works (10), outline applications (8). 1 large-scale development was submitted during this period.
1 planning appeal was lodged, of which 1 was allowed and 0 were dismissed (100% success rate).