Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Torwood, Falkirk Planning Applications

Recent planning applications near Torwood, Falkirk.

Falkirk · Scotland · settlement

View council

About Torwood

Torwood is a quaint village situated within the Falkirk Council area of Scotland, approximately 2 miles north-northwest of Larbert, 4 miles northwest of Falkirk, and 6 miles south-southeast of Stirling. With a population of 245 as per the 2011 UK Census, this small community may present unique opportunities and considerations for planning applications in the region.

Enter a postcode to search for planning applications near Torwood.

Town Insights

Property Prices

Area Information

  • Admin district: Falkirk
  • Parliamentary constituency: Alloa and Grangemouth
  • LSOA: Stenhousemuir West - 02

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near Torwood.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Torwood.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Torwood based on the last 24 months of planning data.

Nearby Applications

2 planning applications found near Torwood.

  1. - Torwood Head Cottage Torwood Larbert FK5 4SL
    Development of Land for Residential Use
    Status: Withdrawn | Type: Outline | Council: Falkirk | Date: 2026-01-21
    View full details
  2. - Bluebell Wood Glenbervie Mews Torwood Larbert FK5 4ZQ
    Change of Use from Private Open Space to Private Garden Ground (Retrospective)
    Status: Undecided | Type: Full | Council: Falkirk | Date: 2026-01-16
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Torwood in Falkirk

Torwood is a quaint village situated within the Falkirk Council area of Scotland, approximately 2 miles north-northwest of Larbert, 4 miles northwest of Falkirk, and 6 miles south-southeast of Stirling. With a population of 245 as per the 2011 UK Census, this small community may present unique opportunities and considerations for planning applications in the region.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Torwood a particularly low-crime area.

For anyone interested in property development or monitoring local planning decisions, Torwood planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Torwood

In the last 24 months, 6 planning applications were submitted near Torwood. Of these, 67% were approved, with an average decision time of 54 days.

This is below the national average of approximately 87%, which may reflect stricter local policies, sensitivity of the area, or higher levels of speculative applications. Pre-application advice is particularly worthwhile near Torwood.

The average decision time of 54 days is within the government's 8-week statutory target for minor applications, indicating an efficient planning department.

The most common application types near Torwood were full planning applications (5), outline applications (1). Full planning applications account for 83% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.

In terms of development scale, 1 medium-scale application, 5 smaller schemes were submitted.

Nearby Towns

Explore planning applications in nearby areas:

  • North Broomage planning applications
  • Plean planning applications
  • Larbert planning applications
  • Tamfourhill planning applications
  • South Broomage planning applications
  • Cowie planning applications
  • High Bonnybridge planning applications
  • Bonnybridge planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account