Search The Murray planning applications
28 applications received or decided in the last 12 months · within 1 km of the centre of The Murray · updated daily · South Lanarkshire Council
Only 9 applications in the last 90 days, so this shows the last 12 months.
- 9 Napier Hill East Kilbride G75 0JWAwaiting decisionErection of single storey rear extension at existing dwellinghouseReceived 9 Nov 2026P/26/1370
- 23 Brouster Hill East Kilbride G74 1AHApprovedInstallation of replacement timber frame sash and case windows to A listed dwellinghouseReceived 14 Sep 2026Decided 6 Nov 2026P/26/1155
- Alistair Mccoist Complex Quarry Road East Kilbride G75 9LWApprovedInstallation of 50kW roof mounted solar array and 50kW battery storage system with associated infrastructureReceived 27 Jul 2026Decided 18 Sep 2026P/26/0788
- Lockups On North Side Of Strathcona Lane East KilbrideApprovedUse of existing lock-up garages (Sui generis) to form commercial storage units and ancillary office (Class 6) (Planning permission in principle)Received 27 Jul 2026Decided 25 Sep 2026P/26/0807
- 23 Headhouse Green East Kilbride G75 0BYApprovedRemoval of existing conservatory and erection of single story side and front extension.Received 15 Jul 2026Decided 21 Aug 2026P/26/0847
Planning in The Murray
- Approved
- 91%
- 30 of 32 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of The Murray in the last 24 months, from South Lanarkshire Council's planning register.
Decided by South Lanarkshire CouncilCouncil page
Around The Murray
Postcode districts
G74 109 applications in the last 12 monthsG75 65 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: South Lanarkshire Council
For home projects and trades
- Architects in The MurrayFor planning applications, extensions and new builds.
- Building contractors in The MurrayLocal builders for approved plans and permitted development.
Builders and trades: get new The Murray jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About The Murray
The Murray is a settlement located in South Lanarkshire, Scotland.
There are currently no active flood warnings for the The Murray area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes The Murray a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, The Murray planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near The Murray, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 38 planning applications were submitted near The Murray. Of these, 91% were approved, with an average decision time of 77 days.
The most common types were full planning applications (17), outline applications (3), discharge of conditions (2).