Search Stubshaw Cross planning applications
22 applications received or decided in the last 12 months · within 1 km of the centre of Stubshaw Cross · updated daily · Wigan Metropolitan Borough Council
Only 6 applications in the last 90 days, so this shows the last 12 months.
- 18 Bryn Road South Ashton-in-Makerfield Wigan WN4 8QRAwaiting decisionCreation of permanent vehicular footpath crossing and installation of drivewayReceived 3 Nov 2026A/26/101650/HH
- Land Adjacent 245 Bryn Road Ashton-In-Makerfield Wigan WN4 8BUAwaiting decisionCondition Discharge application to discharge Condition No.4 (Drainage), Condition No.5 (Noise) and Condition No.6 (Contamination) in respect of approved application A/23/95359/FULLReceived 30 Oct 2026A/26/101735/CON
- Land At Fleming Drive Ashton-in-makerfield WN4 8TXAwaiting decisionTwo storey detached four bed dwelling with integral garage, new boundary treatments including hard and soft landscaping theretoReceived 14 Sep 2026A/26/101274/FULL
- Parks Office Three Sisters Recreation Area Three Sisters Road Ashton-in-makerfield Wigan WN4 8DDAwaiting decisionSingle storey rear extension together with associated external alterations and relocation of access rampReceived 4 Sep 2026A/26/101399/FULL
- 18 Greenfields Crescent Ashton-in-Makerfield Wigan WN4 8QZRefusedChange of use of land to incorporate 1.8 metre high boundary fence to front and side as part of garden, together with, two storey side extension, single storey rear extension and external alterations to fenestrationReceived 1 Sep 2026Decided 27 Oct 2026A/26/101395/FULL
Planning in Stubshaw Cross
- Approved
- 90%
- 18 of 20 decided
- Decision time
- about 9 weeks
- on average
Applications within 1 km of the centre of Stubshaw Cross in the last 24 months, from Wigan Metropolitan Borough Council's planning register.
Decided by Wigan Metropolitan Borough CouncilCouncil page
Around Stubshaw Cross
Postcode districts
WN4 102 applications in the last 12 monthsWN2 159 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Wigan Metropolitan Borough Council
For home projects and trades
- Architects in Stubshaw CrossFor planning applications, extensions and new builds.
- Building contractors in Stubshaw CrossLocal builders for approved plans and permitted development.
Builders and trades: get new Stubshaw Cross jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Stubshaw Cross
Stubshaw Cross is a market town located in the Metropolitan Borough of Wigan, Greater Manchester, just 4 miles south of Wigan. With a population of 26,380 as recorded in the 2021 census, this area is an important consideration for planning applications, reflecting its community size and development potential.
There are currently no active flood warnings for the Stubshaw Cross area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Stubshaw Cross a particularly low-crime area, which is often reflected in its desirability and property values.
For anyone interested in property development or monitoring local planning decisions, Stubshaw Cross planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Stubshaw Cross, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 30 planning applications were submitted near Stubshaw Cross. Of these, 90% were approved, with an average decision time of 62 days.
The most common types were full planning applications (6), discharge of conditions (2), tree works (1). 1 large-scale development was submitted during this period.