Search Stainton (CA11) planning applications
11 applications received or decided in the last 12 months · within 1 km of the centre of Stainton (CA11) · updated daily · Westmorland and Furness Council
Only 3 applications in the last 90 days, so this shows the last 12 months.
- Land adjacent to The Mains Stainton Penrith CA11 0DZAwaiting decisionApplication for the approval of details reserved by condition 3 (landscape works) attached to approval 2026/0801/FPA.Approval of Details Reserved by Condition(s)Received 20 Oct 20262026/2021/DISC
- Land adjacent to The Mains Stainton Penrith CA11 0DZAwaiting decisionApplication for the approval of details reserved by conditions 5 (surface water drainage plan), 6 (carriageway, footway, footpath & cycle ways), 7 (vehicle turning space), 8 (CEMP), 9 (ecological mitigation measures), 10 (construction method statement) and 11 (archeological scheme of investigation) attached to approval 20/0134Approval of Details Reserved by Condition(s)Received 20 Oct 20262026/2020/DISC
- Quarry Garage Slapestones Redhills Penrith CA11 0EBApprovedNon - material amendment to change description of proposal from "Demolition of redundant industrial building and construction of Class B2 industrial building and roof water drainage system" to "construction of Class B2 industrial building and roof water drainage system"attached to approval 2026/0123/FPA.Non-Material AmendmentReceived 9 Oct 2026Decided 26 Oct 20262026/1953/NMA
- Brooklyn House Stainton PENRITH CA11 0EPAwaiting decisionListed building consent for conservatory extension to side of existing outhouse.Listed Building ConsentReceived 4 Aug 20262026/1566/LBC
- Brooklyn House Stainton PENRITH CA11 0EPAwaiting decisionConservatory extension to side of existing outhouse.HouseholderReceived 4 Aug 20262026/1565/HOU
Planning in Stainton (CA11)
- Approved
- 93%
- 13 of 13 decided
- Decision time
- about 10 weeks
- on average
Applications within 1 km of the centre of Stainton (CA11) in the last 24 months, from Westmorland and Furness Council's planning register.
Decided by Westmorland and Furness CouncilCouncil page
Around Stainton (CA11)
Postcode districts
CA11 237 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Westmorland and Furness Council
For home projects and trades
- Architects in StaintonFor planning applications, extensions and new builds.
- Building contractors in StaintonLocal builders for approved plans and permitted development.
Builders and trades: get new Stainton jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Stainton (CA11)
Stainton is a settlement located in Cumbria, England. The settlement has a population of approximately 316 (2021 estimate). It sits within the Westmorland and Furness district.
There are currently no active flood warnings for the Stainton area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Stainton a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Stainton has 4 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Stainton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Stainton, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 19 planning applications were submitted near Stainton. Of these, 93% were approved, with an average decision time of 72 days.
The most common types were full planning applications (9), outline applications (2), discharge of conditions (2).
2 planning appeals were lodged, of which 0 were allowed and 2 were dismissed (0% success rate).