Search Ringley planning applications
14 applications received or decided in the last 12 months · within 1 km of the centre of Ringley · updated daily · Bolton Metropolitan Borough Council
Only 7 applications in the last 90 days, so this shows the last 12 months.
- Land To Rear Of Units B1 B2 C1 At Europa Trading Estate Stoneclough Road Stoneclough Radcliffe Bolton M26 1GGAwaiting decisionINSTALLATION OF MATERIAL TO CREATE HARDSURFACING, USE OF THE LAND FOR STORAGE OF CONTAINERS AND OPEN STORAGE, ERECTION OF 2.59M HIGH TIMBER BOUNDARY FENCE AND 2.4M HIGH WELDMESH FENCING, ALONG WITH MEANS OF ACCESS AND LANDSCAPINGReceived 20 Oct 202601869/26
- Unit H1 To H2 Europa Way Stoneclough Radcliffe Bolton Manchester M26 1GGAwaiting decisionDEMOLITION OF UNIT H2 TO CREATE OPEN AIR STORAGE AREA, PARTIAL DEMOLITION AND ALTERATION OF UNIT H1 TO CREATE OFFICES AND TRAINING FACILITY TOGETHER WITH INSTALLATION OF BOUNDARY FENCING, TREE PLANTING, LANDSCAPING, DROPPED KERBS AND ENLARGEMENT TO EXISTING CAR PARK TO CREATE A TOTAL OF NO. 78 PARKING SPACESReceived 9 Oct 202601782/26
- 1 Edenbridge Drive Stoneclough Radcliffe Bolton Manchester M26 1GNAwaiting decisionERECTION OF FENCE AT REAR AND SIDEReceived 24 Sep 202601723/26
- Fletcher Court Stoneclough Radcliffe Bolton Manchester M26 1PZAwaiting decisionINSTALLATION OF REPLACEMENT WINDOWS AND DOORSReceived 14 Aug 202601487/26
- 19 Ringley Meadows Stoneclough Radcliffe Manchester M26 1ERApprovedDEMOLITION OF CONSERVATORY AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSIONHouseholder Application for pl. permissiReceived 10 Jul 2026Decided 8 Sep 202601281/26
Planning in Ringley
- Approved
- 81%
- 13 of 14 decided
- Decision time
- about 11 weeks
- on average
Applications within 1 km of the centre of Ringley in the last 24 months, from Bolton Metropolitan Borough Council's planning register.
Decided by Bolton Metropolitan Borough CouncilCouncil page
Around Ringley
Postcode districts
M26 119 applications in the last 12 months
Applications in each district in the last 12 months.
Nearby towns and villages
Planning authority: Bolton Metropolitan Borough Council
For home projects and trades
- Architects in RingleyFor planning applications, extensions and new builds.
- Building contractors in RingleyLocal builders for approved plans and permitted development.
Builders and trades: get new Ringley jobs that match your work. See Leads
Application types: Rear extensionsLoft conversionsHouseholder applicationsTree works & TPOListed building consentChange of useAnnexes & granny flatsSolar panelsBarn conversionsBasement extensions
About Ringley
Ringley, located on the east bank of the River Irwell near Kearsley in Greater Manchester, features notable landmarks such as St Saviour's Anglican church. The area is well-connected by the A667 road, which links it to Stoneclough and includes the Ringley road bridge, situated upstream from the historic 17th-century Ringley Old Bridge. This infrastructure makes Ringley a relevant location for planning applications in the region.
There are currently no active flood warnings for the Ringley area, indicating a relatively low flood risk at present. This is a positive factor for both existing residents and those considering property purchases or new developments.
In terms of safety, there were no crimes reported in the immediate area during the most recent reporting period (May 2026). This makes Ringley a particularly low-crime area, which is often reflected in its desirability and property values.
The area around Ringley has 4 nature designations nearby, which may affect how planning applications are assessed.
For anyone interested in property development or monitoring local planning decisions, Ringley planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
To comment on or object to a planning application near Ringley, open it in the list above: each one links to the council's own page for it and shows any comment deadline.
In the last 24 months, 25 planning applications were submitted near Ringley. Of these, 81% were approved, with an average decision time of 74 days.
The most common types were full planning applications (10), discharge of conditions (5), outline applications (2).