Home Property Search Planning by Council Planning by Town Latest Planning Applications Architects Building Contractors Conservation Areas Listed Buildings Heritage at Risk Flood Risk Enterprise Pricing Blog About FAQ Sign In Sign Up

Rawmarsh, South Yorkshire Planning Applications

Recent planning applications near Rawmarsh, South Yorkshire.

South Yorkshire · England · Town

View council

About Rawmarsh

Rawmarsh is a village located in the Metropolitan Borough of Rotherham, South Yorkshire, situated 2 miles north-northeast of Rotherham town centre and 3 miles south-southwest of Swinton. As part of the Sheffield Urban Area, it had a population of 13,389 according to the 2011 Census, with surrounding areas increasing this number to approximately 18,500 by 2014. This demographic information is crucial for those researching planning applications and developments in the region.

Enter a postcode to search for planning applications near Rawmarsh.

Town Insights

Property Prices

Average property sale price: £201,770 (based on 50 recent transactions from HM Land Registry).

Area Information

  • Admin district: Rotherham
  • Parliamentary constituency: Rawmarsh and Conisbrough
  • LSOA: Rotherham 006D

Crime Statistics

0 crimes reported in 2026-02.

Flood Risk

No active flood warnings near Rawmarsh.

Keyword Scorecard

Planning constraint analysis based on the last 24 months of applications near Rawmarsh.

  • Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
  • Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
  • Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
  • Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
  • Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
  • Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
  • Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
  • Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)

Planning Activity Summary

Approval rates, average decision times, and application type distribution for Rawmarsh based on the last 24 months of planning data.

Nearby Applications

3 planning applications found near Rawmarsh.

  1. - 21 Monkwood Road Rawmarsh 0021
    Change of use from hot food takeaway to retail shop
    Status: Withdrawn | Type: Amendment | Council: Rotherham | Date: 2026-04-23
    View full details
  2. - 70 Monkwood Road Rawmarsh 0070
    Lawful Development Certificate re proposed dormer window to rear and installation of rooflights
    Status: Permitted | Type: Outline | Council: Rotherham | Date: 2026-01-27
    View full details
  3. - 15 Wilson Avenue Rawmarsh 0015
    Two storey side and rear extension and alterations to existing outbuilding
    Status: Permitted | Council: Rotherham | Date: 2026-01-14
    View full details

Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.

A brief summary of Rawmarsh in South Yorkshire

Rawmarsh is a village located in the Metropolitan Borough of Rotherham, South Yorkshire, situated 2 miles north-northeast of Rotherham town centre and 3 miles south-southwest of Swinton. As part of the Sheffield Urban Area, it had a population of 13,389 according to the 2011 Census, with surrounding areas increasing this number to approximately 18,500 by 2014. This demographic information is crucial for those researching planning applications and developments in the region.

Property prices in Rawmarsh show an average sale price of £201,770, based on 50 recent transactions recorded by HM Land Registry.

There were no crimes reported in the immediate area during the most recent reporting period. This makes Rawmarsh a particularly low-crime area.

Ecology & Nature Designations

The area around Rawmarsh includes 1 Ancient Woodland site. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.

For anyone interested in property development or monitoring local planning decisions, Rawmarsh planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.

Planning Activity in Rawmarsh

In the last 24 months, 7 planning applications were submitted near Rawmarsh. Of these, 83% were approved, with an average decision time of 77 days.

This is broadly in line with the national average of approximately 87%. Rawmarsh maintains a standard approach to planning decisions.

The average decision period of 77 days exceeds the 8-week target for minor applications but falls within the 13-week target for major schemes. Applicants should plan for approximately 11 weeks from submission to decision.

The most common application types near Rawmarsh were discharge of conditions (2), amendments (2), outline applications (1).

In terms of development scale, 3 medium-scale applications, 4 smaller schemes were submitted.

Nearby Towns

Explore planning applications in nearby areas:

  • Parkgate planning applications
  • Ryecroft planning applications
  • Upper Haugh planning applications
  • Abdy planning applications
  • Aldwarke planning applications
  • Newhill planning applications
  • Eastwood planning applications
  • Nether Haugh planning applications

Related Planning Guides

  • What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
  • What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
  • How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.

Planning Signal - Search planning applications across 380+ UK councils.

Home Property Search Planning by Council Planning by Town Latest Applications Architects Directory Contractors Directory Conservation Areas Listed Buildings Heritage at Risk Flood Risk Pricing Enterprise Blog Knowledge Hub About FAQ Privacy Policy Terms of Service Sitemap Planning Portals Sign In Create Account