Panpunton, Powys Planning Applications
Recent planning applications near Panpunton, Powys.
Powys · Wales · settlement
Enter a postcode to search for planning applications near Panpunton.
Town Insights
Property Prices
Average property sale price: £308,674 (based on 50 recent transactions from HM Land Registry).
Area Information
- Admin district: Powys
- Parliamentary constituency: Brecon, Radnor and Cwm Tawe
- LSOA: Powys 011C
Crime Statistics
0 crimes reported in 2026-02.
Flood Risk
No active flood warnings near Panpunton.
Keyword Scorecard
Planning constraint analysis based on the last 24 months of applications near Panpunton.
- Ecology & Wildlife Constraints (keywords: bats, bat survey, bat roost, great crested newt, GCN...)
- Trees & Landscape (keywords: tree preservation order, TPO, arboricultural, tree survey, root protection area...)
- Flood & Drainage (keywords: flood zone 2, flood zone 3, flood risk assessment, FRA, surface water...)
- Heritage & Conservation (keywords: listed building, grade II, grade II*, grade I, conservation area...)
- Green Belt (keywords: green belt, inappropriate development, very special circumstances, openness)
- Highways & Access (keywords: visibility splays, highway authority objection, access arrangement, parking provision, transport statement...)
- Refusal & Risk Indicators (keywords: refusal, delegated refusal, appeal dismissed, overdevelopment, character and appearance...)
- Planning Process & Appeals (keywords: appeal lodged, appeal allowed, appeal dismissed, public inquiry, inspector)
Planning Activity Summary
Approval rates, average decision times, and application type distribution for Panpunton based on the last 24 months of planning data.
Nearby Applications
7 planning applications found near Panpunton.
- - The Laurels Penybont Road Knighton LD7 1HB
Demolition of existing outhouse and erection of replacement lean to garden room
Status: Undecided | Type: Full | Council: Powys | Date: 2026-03-11
View full details - - 18 High Street Knighton LD7 1AT
Erection of double garage / garden store / garden room (to replace a demolished single garage)
Status: Permitted | Type: Full | Council: Powys | Date: 2026-01-06
View full details - - 16 Norton Street Knighton LD7 1ET
Replacement of wooden framed sash single-glazed windows with plastic framed sash double-glazed windows
Status: Rejected | Type: Full | Council: Powys | Date: 2025-11-14
View full details - - Land North Of West Street West Street Knighton Powys
Discharge of conditions 8 and 29 of planning approval 23/0832/REM
Status: Undecided | Type: Conditions | Council: Powys | Date: 2025-11-14
View full details - - 9A High Street Knighton LD7 1AT
External works to include repair to timber framed gable
Status: Permitted | Type: Heritage | Council: Powys | Date: 2025-10-24
View full details - - Tan Y Bryn Crabtree Walk Knighton LD7 1EW
Side and porch extension
Status: Permitted | Type: Full | Council: Powys | Date: 2024-01-31
View full details - - 5 Church Street Knighton LD7 1AG
Application to discharge conditions 5, 7 and 8 attached to permission 22/1043/FUL
Status: Unresolved | Type: Conditions | Council: Powys | Date: 2023-07-14
View full details
Use the filter and sort options to search descriptions, addresses, and references. Sort by newest or oldest applications.
A brief summary of Panpunton in Powys
Panpunton is a settlement located in Powys, Wales.
Property prices in Panpunton show an average sale price of £308,674, based on 50 recent transactions recorded by HM Land Registry.
There were no crimes reported in the immediate area during the most recent reporting period. This makes Panpunton a particularly low-crime area.
Ecology & Nature Designations
The area around Panpunton includes 1 Sites of Special Scientific Interest (SSSI): River Teme SSSI; 9 Ancient Woodland sites; 1 Areas of Outstanding Natural Beauty (AONB): Shropshire Hills. These designations may affect planning decisions, as proposals near protected sites require environmental impact assessment and may face additional restrictions.
For anyone interested in property development or monitoring local planning decisions, Panpunton planning applications can be searched by entering a local postcode above. Results include full application details, decision status, and the ability to track applications over time and set planning alerts to help you monitor and review pending planning applications.
Planning Activity in Panpunton
In the last 24 months, 5 planning applications were submitted near Panpunton. Of these, 67% were approved, with an average decision time of 83 days.
This is below the national average of approximately 87%, which may reflect stricter local policies, sensitivity of the area, or higher levels of speculative applications. Pre-application advice is particularly worthwhile near Panpunton.
The average decision period of 83 days exceeds the 8-week target for minor applications but falls within the 13-week target for major schemes. Applicants should plan for approximately 12 weeks from submission to decision.
The most common application types near Panpunton were full planning applications (3), listed building and heritage (1), discharge of conditions (1). Full planning applications account for 60% of all submissions, covering new builds, change of use, and works that go beyond permitted development rights.
Nearby Towns
Explore planning applications in nearby areas:
- Knighton/Tref-y-Clawdd planning applications
- Garth planning applications
- Nether Skyborry planning applications
- Rhos-y-meirch planning applications
- Skyborry Green planning applications
- Purlogue planning applications
- New Invention planning applications
- Milebrook planning applications
Related Planning Guides
- What Is Planning Permission in the UK? — Planning permission is the formal approval you need from your local council before making certain changes to a building or piece of land.
- What Is Permitted Development? — Permitted development rights allow certain building works and changes of use without the need to apply for planning permission.
- How Long Does Planning Permission Take? — Typical timelines for planning permission decisions in the UK, from submission to approval, and what can cause delays.